Resources Steel Facilities · Nigeria

18,000-Ton On-Land Modular Process Skids

Fabricated in Niger Delta Region. Epoxy coating, bolted trial assembly. Handover 40 Days Ahead of Schedule.

18,000 tSteel Tonnage
100% BoltedAssembly
40 Days EarlyDelivery
Pre-InstalledPiping

Project Facts

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
IndustryOil & Gas Processing Skids
LocationNiger Delta Region, Nigeria
Construction TypeHeavy-Duty Modular Skid Frames
Project Scale18,000 Tons of Steel Structures
Service EnvironmentTropical High-Humidity Epoxy
Delivery ResultHandover 40 Days Ahead of Schedule
Our ScopeFabrication, epoxy coating, bolted trial assembly and delivery

Project Overview

How the structure was engineered, fabricated and delivered in Niger Delta Region.

Located in Nigeria, this on-land modular skid facility provides processing infrastructure for local oil and gas extraction. Operating in remote areas presents logistical challenges. Managers must navigate unpaved terrain and a shortage of specialized on-site welding labor, which delays construction.

Shijie addressed these hurdles with an integrated modular skid solution. Our engineers designed heavy-duty steel frameworks supporting dense configurations of industrial pipelines, vessels, and grating walkways.

By maximizing factory pre-fabrication, we minimized complex field assembly. The skids were transported and installed using straightforward bolted connections.

A heavy-duty anti-corrosion coating protects structures from the humid environment. Completing the installation 40 days early allowed operators to commence processing reliably.

Completed modular skid facility at a Niger Delta oil and gas site, seen from above

Four Decisions That Made It Work

01

18,000-Ton On-Land Modular Skids in Nigeri

Pre-Fabricated Integration and Field Efficiency

02

High-Density Integration

Heavy steel skids are engineered to support complex networks of industrial pipelines and pressure vessels efficiently.

03

Factory Pre-Fabrication

Maximizing off-site manufacturing ensures quality control and reduces the dependency on skilled field welders.

04

Tropical Durability

An industrial-grade anti-corrosion coating system protects the framework from the high humidity typical of the region.

Client Testimonial

Feedback recorded from the client after handover.

Completed 18,000-Ton On-Land Modular Skids in Nigeria: Pre-Fabricated Integration and Field Efficiency with the SynJect fabrication and installation team at handover
Fabrication and installation team at project handover
“

Developing processing infrastructure in Nigeria requires practical engineering. Transporting materials over red dirt roads is difficult, and finding certified welders for field fabrication always delays our schedule. Shijie provided a modular skid solution that fit our site conditions.

Adebayo O.Field Operations Manager, Nigerian Petroleum Co.
18,000 t40 Days Early100% Bolted

Frequently Asked Questions

Answers engineers ask before committing to a scope like this.

What exactly did SynJect deliver for this 18,000-ton modular skid project in Nigeria?

We delivered 18,000 tons of heavy-duty modular skid frames for an onshore oil and gas processing facility in the Niger Delta, including pre-installed process piping, vessel supports and hot-dip galvanised grating walkways. Every module was fabricated, trial-fitted and inspected in our Shandong works before shipment.

Each skid frame was split into transport-sized modules that fit standard 40 ft containers and flat racks, with certified lifting points, match-marked bolted interfaces and a container-nested loading plan. Nothing had to be cut, re-drilled or re-welded on arrival.

All steel is blast cleaned to Sa 2.5 with a 45-75 micron profile, then coated with a high-build epoxy system specified for tropical C4-C5 service. Weld seams and cut edges receive stripe coats, and dry film thickness is checked on every batch before dispatch.

Yes. All field connections are 100% bolted with high-strength bolts, and we supply numbered erection drawings plus match-marked components. The client’s local team completed assembly under our site supervisor with zero field welding and no specialist rigging beyond a standard mobile crane.

By pushing maximum work into the factory, with piping, grating, supports and coating all completed before shipment, site activity was reduced to logistics and bolting. Because the facility was delivered as independent modules, the client could start commissioning each process area before the final shipment arrived.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam