Home / News
News & Insights
NEWS
To be confirmed
FEATURED PROJECT
Oil, Gas & Chemical · On-land Modular Skids
Oct 9, 2026
TOPIC
Technical Insights
Oct 26, 2026
14 min read
Steel structure construction runs as six linked stages, from design basis and detailing through fabrication, erection, connections and handover. This guide sets out the codes, tolerances and inspection points an EPC buyer should audit at each stage.
Technical Insights
Oct 26, 2026
12 min read
A line-by-line cost breakdown for a 5,000 m² PEB steel warehouse in the UAE: shell cost per m², the source of the 25% saving against concrete, sabkha ground risk and the standards that govern it.
Technical Insights
Oct 20, 2026
7 min read
A 15,000 m² prefabricated steel warehouse in Morocco: indicative CIF cost of USD 1,575,000, RPS 2000 and Eurocode design basis, and a 12-14 week programme against 20-25 weeks for local fabrication.
Technical Insights
Oct 20, 2026
8 min read
Seven checks for evaluating a steel fabricator in Morocco: EN 1090-2 EXC2 execution, RPS 2000 seismic design, auditable NDT records and transparent CIF terms — with the questions to ask at quotation stage.
Technical Insights
Oct 20, 2026
7 min read
A 2,000 m² prefabricated steel warehouse in Indonesia: indicative CIF cost of USD 430,500 (about USD 215/m²), SNI 1729:2020 design, and an 8-12 week design-to-port programme versus 18+ weeks for local fabrication.
Technical Insights
Oct 16, 2026
9 min read
Light gauge steel frame vs structural steel: what actually differs for Indonesian projects — manufacture, load path, SNI 7971 vs SNI 1729, spans and how to compare complete quotations.
Have drawings or a BOQ ready?