160-Meter Clear Span Environmental Coal Shed
Fabricated in South African Mining Hub. Epoxy coating, shop assembly. Completed 40 Days Early.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | Enclosed Coal Storage Shed |
|---|---|
| Location | South African Mining Hub |
| Construction Type | Barrel Vault Space Frame |
| Project Scale | 160-Meter Span, 45,000 sqm |
| Service Environment | Heavy Acid-Resistant Epoxy |
| Delivery Result | Completed 40 Days Early |
| Our Scope | Fabrication, epoxy coating, shop assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in South African Mining Hub.
Located in South Africa's arid mining heartland, this 45,000 sqm enclosed coal shed represents a critical leap in sustainable infrastructure. In the mining industry, authorities impose paralyzing fines for fugitive dust pollution. Operators are haunted by the risk of spontaneous coal combustion in enclosed spaces, and the nightmare of erecting a massive roof over continuously running conveyors without halting production.
Shijie Heavy Industry eradicated these anxieties by delivering a state-of-the-art barrel vault tubular space frame. Engineered with a 160-meter column-free clear span, this masterpiece allows giant dump trucks to maneuver inside with zero obstruction.
By utilizing precision-machined bolted spherical nodes, we eliminated hazardous on-site hot work in a highly combustible environment. To guarantee uninterrupted mining, our teams pre-assembled massive segments and utilized hydraulic strand jacks to incrementally push the structure over the active coal yard. The aerodynamic shape prevents dangerous dust accumulation, while integrated vents naturally exhaust explosive gases.
Coated with heavy-duty anti-corrosion armor, the steel resists the acidic environment. By sealing the facility 40 days ahead of the regulatory deadline, Shijie secured the client's permits and safeguarded uninterrupted revenue.

Four Decisions That Made It Work
160-Meter Clear Span Environmental Coal Sh
Dust Control and Rapid Assembly
Unobstructed Mega Span
The 160-meter column-free barrel vault provides an immense interior, ensuring absolute freedom for heavy mining trucks.
Environmental Lockdown
The sealed envelope completely traps fugitive coal dust, transforming a polluting stockpile into a compliant green facility.
Anti-Combustion Aerodynamics
Engineered natural ventilation continuously extracts trapped heat and methane gases, neutralizing the threat of combustion.
The Project, As Built
Completed works, structural details and the delivery team on site.




Client Testimonial
Feedback recorded from the client after handover.
Faced with imminent government shutdowns due to severe dust pollution, we urgently needed to enclose our stockpile. A conventional build would have halted conveyors for months, costing millions. Shijie provided an absolute lifeline.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What is this 45,000 sqm structure in South Africa?
An enclosed coal storage shed built as a barrel vault tubular space frame with a 160-metre column-free clear span, covering the stockpile area of an active mining operation in South Africa’s arid mining heartland.
Why 160 metres without a single internal column?
Because the trucks have to work inside. A clear span of that size lets haul trucks manoeuvre and tip under cover with no obstruction, which is the whole reason for enclosing the stockpile rather than building a conventional shed with columns in the operating zone.
Fugitive coal dust attracts heavy environmental penalties. Does the shed actually contain it?
The envelope is sealed, so the stockpile stops being a dust source. That converts an open yard that regulators fine into a compliant enclosed facility – which is usually the trigger for the project in the first place.
Coal in an enclosed space can self-heat and accumulate methane. How is that controlled?
Engineered natural ventilation continuously extracts trapped heat and methane through the ridge, so gases do not reach explosive concentration. Anti-explosion venting is designed in, not retrofitted after an incident.
Could the shed be built without stopping the mine?
Yes, and that was the deciding factor. The space frame was assembled in sections and pushed into position on hydraulic rails over the live stockpile while the conveyors kept running 24/7. The shed was completed 40 days early with zero production downtime.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam