830 m² Steel Climbing Gym
A bouldering hall engineered around its walls — reinforced roof steel, point loads thought through, and a mezzanine above the mats.
Project Facts
Facts a contractor checks first: Indoor bouldering and climbing gym - Multi-span steel frame with reinforced roof steel, 830 m² over two storeys with mezzanine.
| Industry | Indoor bouldering and climbing gym - boulder walls, training boards, café corner |
|---|---|
| Construction type | Multi-span steel frame with reinforced roof steel - mist blue-grey cladding, insulated panels |
| Project scale | 830 m² over two storeys with mezzanine - 24.4 m wide, 34 m long |
| Location | Kuala Lumpur outskirts, Malaysia - monsoon rain, high humidity |
| Collaborators | Gym operator · wall manufacturer · local civils - wall anchor points set out before erection |
| Delivery | 15 weeks - mats down for the opening season |
| Our scope | Structural design and 3D modelling · multi-span steel frame · reinforced roof steel for wall point loads · insulated sandwich panels · mezzanine framing · mist blue-grey cladding · erection drawings and site support |
Project Overview
SynJect engineered an 830 m² bouldering gym on the outskirts of Kuala Lumpur — a mist blue-grey steel box whose roof steel carries what most buildings never have to: the climbing walls themselves.
SynJect engineered an 830 m² bouldering gym on the outskirts of Kuala Lumpur — a mist blue-grey steel box whose roof steel carries what most buildings never have to: the climbing walls themselves.
The walls decided the frame. Anchor points were fixed with the wall manufacturer before fabrication, and the joists above the main hall were reinforced for the concentrated loads of overhanging panels and volume climbs.
Around the hall, the building is a plain, well-insulated box: sandwich panels in mist blue-grey, a training mezzanine over the changing rooms, and glazing enough to keep the mats daylit through the monsoon.
Photographed through erection and completion: the frame going up, the gym from the air with its rooftop solar array, the street elevation, and the boulder hall before the first chalk.

Four Decisions That Made It Work
Design For The Point Loads
Reinforced joists take the wall anchors, so the operator can reconfigure walls every season.
Set Anchors Before Fabrication
Anchor points agreed with the wall maker meant no drilling surprises on site.
Insulate Like A Hall, Not A Shed
Sandwich panels keep the mats cool and the cooling bill flat through the tropical heat.
Float A Training Mezzanine
The board and campus room sits above the services, keeping every ground-floor metre for climbing.
The Project, As Built
Completed structure, photographed on site.






Client Testimonial
Feedback from Gym Founder after handover.

The wall crew anchored straight onto our steel. Not one drilled hole out of place.
Frequently Asked Questions
Common questions from buyers specifying this building type.
Can the roof carry the climbing walls?
Yes. The joists over the hall are reinforced for the concentrated loads of anchored walls and overhangs.
When are the anchor points fixed?
Before fabrication, together with the wall manufacturer — no drilled surprises during fitout.
Can walls be reconfigured later?
The frame carries generous reserve, so panels and volumes move without touching the structure.
What is included in your scope?
Multi-span frame, reinforced roof steel, insulated panels, mezzanine framing, cladding, erection drawings and site support.
How tall should a bouldering hall be?
An 8.5 m eave clears the highest volumes, the mezzanine and the light lines without wasted volume.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam