18,000-Ton On-Land Modular Process Skids
Fabricated in Niger Delta Region. Epoxy coating, bolted trial assembly. Handover 40 Days Ahead of Schedule.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | Oil & Gas Processing Skids |
|---|---|
| Location | Niger Delta Region, Nigeria |
| Construction Type | Heavy-Duty Modular Skid Frames |
| Project Scale | 18,000 Tons of Steel Structures |
| Service Environment | Tropical High-Humidity Epoxy |
| Delivery Result | Handover 40 Days Ahead of Schedule |
| Our Scope | Fabrication, epoxy coating, bolted trial assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in Niger Delta Region.
Located in Nigeria, this on-land modular skid facility provides processing infrastructure for local oil and gas extraction. Operating in remote areas presents logistical challenges. Managers must navigate unpaved terrain and a shortage of specialized on-site welding labor, which delays construction.
Shijie addressed these hurdles with an integrated modular skid solution. Our engineers designed heavy-duty steel frameworks supporting dense configurations of industrial pipelines, vessels, and grating walkways.
By maximizing factory pre-fabrication, we minimized complex field assembly. The skids were transported and installed using straightforward bolted connections.
A heavy-duty anti-corrosion coating protects structures from the humid environment. Completing the installation 40 days early allowed operators to commence processing reliably.

Four Decisions That Made It Work
18,000-Ton On-Land Modular Skids in Nigeri
Pre-Fabricated Integration and Field Efficiency
High-Density Integration
Heavy steel skids are engineered to support complex networks of industrial pipelines and pressure vessels efficiently.
Factory Pre-Fabrication
Maximizing off-site manufacturing ensures quality control and reduces the dependency on skilled field welders.
Tropical Durability
An industrial-grade anti-corrosion coating system protects the framework from the high humidity typical of the region.
The Project, As Built
Completed works, structural details and the delivery team on site.





Client Testimonial
Feedback recorded from the client after handover.

Developing processing infrastructure in Nigeria requires practical engineering. Transporting materials over red dirt roads is difficult, and finding certified welders for field fabrication always delays our schedule. Shijie provided a modular skid solution that fit our site conditions.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What exactly did SynJect deliver for this 18,000-ton modular skid project in Nigeria?
We delivered 18,000 tons of heavy-duty modular skid frames for an onshore oil and gas processing facility in the Niger Delta, including pre-installed process piping, vessel supports and hot-dip galvanised grating walkways. Every module was fabricated, trial-fitted and inspected in our Shandong works before shipment.
How were such large skids transported to a remote Delta site with unpaved access roads?
Each skid frame was split into transport-sized modules that fit standard 40 ft containers and flat racks, with certified lifting points, match-marked bolted interfaces and a container-nested loading plan. Nothing had to be cut, re-drilled or re-welded on arrival.
How is the steel protected against Niger Delta humidity and salt-laden air?
All steel is blast cleaned to Sa 2.5 with a 45-75 micron profile, then coated with a high-build epoxy system specified for tropical C4-C5 service. Weld seams and cut edges receive stripe coats, and dry film thickness is checked on every batch before dispatch.
Can local crews assemble the skids without specialist welders or heavy site equipment?
Yes. All field connections are 100% bolted with high-strength bolts, and we supply numbered erection drawings plus match-marked components. The client’s local team completed assembly under our site supervisor with zero field welding and no specialist rigging beyond a standard mobile crane.
How did the project reach handover 40 days ahead of schedule?
By pushing maximum work into the factory, with piping, grating, supports and coating all completed before shipment, site activity was reduced to logistics and bolting. Because the facility was delivered as independent modules, the client could start commissioning each process area before the final shipment arrived.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam