28,675 m² Livestock Saleyard Cover
A canopy across a working saleyard — set out from the fall of the land, sized for cattle pens below and solar panels above.
Project Facts
Facts a contractor checks first: Agricultural · regional livestock saleyard in Botswana — Open-sided galvanised canopies on portal frames, 185 × 155 m footprint.
| Industry | Agricultural · regional livestock saleyard — covered pens and selling rings |
|---|---|
| Construction type | Open-sided galvanised canopies on portal frames — eave overhangs, solar-support roof |
| Project scale | 185 × 155 m footprint — 28,675 m² across linked canopies |
| Location | Dry cattle country, Botswana — intense sun, dust, seasonal storms |
| Collaborators | Civil and geotechnical engineers · feature surveyor · main contractor — design value-engineered from tender drawings |
| Delivery | 26 weeks on site — built over a saleyard that kept trading |
| Our scope | 3D structural model · value engineering of the tender design · fabricated hot-dip galvanised steel package · purlins and girts · eave overhangs · roof structure designed for solar panel loading · structural engineering drawings, computations and certificates · erection drawings |
Project Overview
The site was already a saleyard. The roof had to go over pens that kept working, on ground that was never flat.
SynJect designed and fabricated the steel package for a 28,675 m² livestock saleyard cover in dry cattle country in Botswana — 185 m by 155 m of linked open-sided canopies above working pens and selling rings. Cool grey white columns and trusses, light pale blue grey roof sheeting and deep brick red pen rails and eaves keep an enormous structure visually calm, and the open sides keep air moving where cattle stand.
The project came to us as tender drawings, so the first job was value engineering. Working with the main contractor, the frame was rationalised into repeatable portal bays, the roof zones were grouped so sheeting and purlins could be ordered in fewer lengths, and the eave overhangs were sized once rather than varied. The savings came from repetition rather than from cutting structure.
Two site conditions shaped the set-out. The ground falls across the saleyard, so the canopy was laid out from a feature survey rather than a standard grid, keeping the pens and races where they already worked. And the yard had to keep trading during construction, which pushed the erection sequence into zones that could be handed back one at a time.
The roof structure was also engineered for solar panel loading, so the saleyard can carry an array later without a second structural review. Every portal, purlin, overhang bracket and tie-down was resolved in one 3D model, and the structural drawings, computations and certificates were issued as one package. The cover was completed in 26 weeks, and handover photographs show empty pens, clean ground and no animal, vehicle or signage anywhere in frame.

Four Decisions That Made It Work
Engineer The Drawing Set
The tender design was rationalised into repeatable bays so purlins, sheeting and brackets could be ordered in fewer lengths.
Follow The Fall
The canopy was set out from a feature survey of the existing yard, keeping pens and races where they already worked.
Build In Zones
Erection was sequenced in hand-back zones, so the saleyard could keep trading while the cover went up.
Allow For Solar
The roof structure was sized for a future panel array, so adding solar later does not trigger a second structural review.
The Project, As Built
Photographed at handover: empty pens, clean ground, no cattle and no vehicles.






Client Testimonial
Feedback from Project Director after handover of the Botswana project.

The yard never stopped trading, the pens stayed where they were, and the roof is ready for solar whenever we are.
Frequently Asked Questions
What saleyard operators ask before roofing a working yard.
What does the 28,675 m² figure cover?
The roofed footprint at 185 x 155 m across the linked canopies. It is covered area only: pens, races, loading ramps and hardstand are existing or separate works, and the solar array is a future addition the roof is already sized for.
How was the roof built over a working saleyard?
Erection was sequenced in zones that could be handed back one at a time, around sale days. Foundations and columns went in away from the pens in use, and each bay was closed out before the next zone opened.
Why set out from a feature survey?
The yard falls across the site and the pens are not on a regular grid. Surveying what exists let the canopy follow the ground and keep the race layout, instead of forcing a standard grid that would have required regrading or moving pens.
What does solar-ready mean here?
The purlins, portal frames and tie-downs were checked for the additional dead load and wind uplift of a panel array, so a future installation does not need the roof opened up or the frame reinforced.
Where did the cost savings come from?
From repetition: fewer purlin and sheeting lengths, grouped roof zones, one eave overhang detail and a rationalised bay grid. The structure itself was not trimmed, because a saleyard roof has to carry solar and storm loads for decades.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam