28,675 m² Livestock Saleyard Cover
A canopy across a working saleyard — set out from the fall of the land, sized for cattle pens below and solar panels above.
Данные проекта
Facts a contractor checks first: Agricultural · regional livestock saleyard in Botswana — Open-sided galvanised canopies on portal frames, 185 × 155 m footprint.
| Промышленность | Agricultural · regional livestock saleyard — covered pens and selling rings |
|---|---|
| Тип конструкции | Open-sided galvanised canopies on portal frames — eave overhangs, solar-support roof |
| Масштаб проекта | 185 × 155 m footprint — 28,675 m² across linked canopies |
| Местоположение | Dry cattle country, Botswana — intense sun, dust, seasonal storms |
| Соавторы | Civil and geotechnical engineers · feature surveyor · main contractor — design value-engineered from tender drawings |
| Доставка | 26 weeks on site — built over a saleyard that kept trading |
| Сфера нашей деятельности | 3D structural model · value engineering of the tender design · fabricated hot-dip galvanised steel package · purlins and girts · eave overhangs · roof structure designed for solar panel loading · structural engineering drawings, computations and certificates · erection drawings |
Обзор проекта
The site was already a saleyard. The roof had to go over pens that kept working, on ground that was never flat.
SynJect designed and fabricated the steel package for a 28,675 m² livestock saleyard cover in dry cattle country in Botswana — 185 m by 155 m of linked open-sided canopies above working pens and selling rings. Cool grey white columns and trusses, light pale blue grey roof sheeting and deep brick red pen rails and eaves keep an enormous structure visually calm, and the open sides keep air moving where cattle stand.
The project came to us as tender drawings, so the first job was value engineering. Working with the main contractor, the frame was rationalised into repeatable portal bays, the roof zones were grouped so sheeting and purlins could be ordered in fewer lengths, and the eave overhangs were sized once rather than varied. The savings came from repetition rather than from cutting structure.
Two site conditions shaped the set-out. The ground falls across the saleyard, so the canopy was laid out from a feature survey rather than a standard grid, keeping the pens and races where they already worked. And the yard had to keep trading during construction, which pushed the erection sequence into zones that could be handed back one at a time.
The roof structure was also engineered for solar panel loading, so the saleyard can carry an array later without a second structural review. Every portal, purlin, overhang bracket and tie-down was resolved in one 3D model, and the structural drawings, computations and certificates were issued as one package. The cover was completed in 26 weeks, and handover photographs show empty pens, clean ground and no animal, vehicle or signage anywhere in frame.

Четыре ключевых решения
Engineer The Drawing Set
The tender design was rationalised into repeatable bays so purlins, sheeting and brackets could be ordered in fewer lengths.
Follow The Fall
The canopy was set out from a feature survey of the existing yard, keeping pens and races where they already worked.
Build In Zones
Erection was sequenced in hand-back zones, so the saleyard could keep trading while the cover went up.
Allow For Solar
The roof structure was sized for a future panel array, so adding solar later does not trigger a second structural review.
Реализованный проект
Photographed at handover: empty pens, clean ground, no cattle and no vehicles.






Отзыв клиента
Feedback from Project Director after handover of the Botswana project.

The yard never stopped trading, the pens stayed where they were, and the roof is ready for solar whenever we are.
Часто задаваемые вопросы
What saleyard operators ask before roofing a working yard.
What does the 28,675 m² figure cover?
The roofed footprint at 185 x 155 m across the linked canopies. It is covered area only: pens, races, loading ramps and hardstand are existing or separate works, and the solar array is a future addition the roof is already sized for.
How was the roof built over a working saleyard?
Erection was sequenced in zones that could be handed back one at a time, around sale days. Foundations and columns went in away from the pens in use, and each bay was closed out before the next zone opened.
Why set out from a feature survey?
The yard falls across the site and the pens are not on a regular grid. Surveying what exists let the canopy follow the ground and keep the race layout, instead of forcing a standard grid that would have required regrading or moving pens.
What does solar-ready mean here?
The purlins, portal frames and tie-downs were checked for the additional dead load and wind uplift of a panel array, so a future installation does not need the roof opened up or the frame reinforced.
Where did the cost savings come from?
From repetition: fewer purlin and sheeting lengths, grouped roof zones, one eave overhang detail and a rationalised bay grid. The structure itself was not trimmed, because a saleyard roof has to carry solar and storm loads for decades.
Получите круглосуточный перечень работ и смету
Узнайте, на каком объеме стального проката и морских перевозок вы сможете сэкономить до начала изготовления
Сокращение веса стальных конструкций
3D-моделирование в Tekla в масштабе 1:1 позволяет оптимизировать соотношение балок и колонн, что позволяет избежать излишних затрат на материалы.
Верификация кода с нулевым количеством конфликтов
Проверено на соответствие стандарту EN 1090 и местным ветровым и сейсмическим нагрузкам.
Обзор «от инженера к инженеру»
Проверено нашими ведущими инженерами — никаких назойливых коммерческих звонков, только полезные данные и цены от производителя.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Ведущие инженеры онлайн
🔒 100% конфиденциальность и безопасность, без спама