14-Storey Steel Office Tower
12,286 m² of lettable floor over a composite steel frame — erected floor by floor, with the structure left exposed at the podium.
Project Facts
Facts a contractor checks first: Speculative office · lettable floor plates with retail at grade - Composite steel beams on profiled metal deck, 14 storeys, 12,286 m² gross.
| Industry | Speculative office · lettable floor plates with retail at grade - column-free corners, 3.9 m floor to floor |
|---|---|
| Construction type | Composite steel beams on profiled metal deck - concrete-filled columns, galvanised beams |
| Project scale | 14 storeys, 12,286 m² gross - typical plate 880 m² |
| Location | Commercial corridor, Guatemala City, Guatemala - seismic zone, high daytime temperature |
| Collaborators | Structural engineer · curtain-wall contractor · MEP consultant - steel package detailed and supplied as one |
| Delivery | 36 weeks from first column to handover - frame, deck, stairs, edge protection |
| Our scope | Structural design and connection detailing · hot-dip galvanised composite beams · concrete-filled steel columns · profiled metal deck and shear studs · steel stairs and landings · primary edge beams for the curtain wall · roof plant framing and parapet · temporary edge protection · erection drawings, lifting plans and site support |
Project Overview
SynJect supplied and detailed the structural steel package for a fourteen-storey office tower in Guatemala City — 12,286 m² of gross floor area on composite beams over profiled metal deck, with concrete-filled columns and a sand-toned louvre screen closing the west face against the afternoon sun.
SynJect supplied and detailed the structural steel package for a fourteen-storey office tower in Guatemala City — 12,286 m² of gross floor area on composite beams over profiled metal deck, with concrete-filled columns and a sand-toned louvre screen closing the west face against the afternoon sun.
The driver was programme. A concrete frame would have needed formwork cycles on every floor; a steel frame with deck lets the floor above be poured while the columns for the floor above that are already being bolted. The steel went up one floor every four working days, and the curtain-wall contractor followed three floors behind, which is what actually shortens a tower.
Guatemala City sits in a seismic zone, so the connections do the work: moment frames at the perimeter, braced bays around the cores, and detailing that keeps the deck diaphragm continuous across the beam lines. Beams and columns are galvanised rather than painted, because a galvanised member can be left exposed at the podium and in the plant room without a second visit.
Exposed structure became the finished look on the lower floors — deck soffit visible, beams honest, services surface-run in red. Above, the sand louvre screen gives the tower a calm, matte face that keeps the glazing in shade instead of adding another mirror to the skyline.

Four Decisions That Made It Work
Pour Behind The Steel
Deck and studs let each slab follow the frame without waiting for formwork, one floor every four days.
Galvanise, Don't Paint
An exposed member at the podium needed no second visit, no site paint and no maintenance cycle.
Brace The Cores, Not The Corners
Braced bays hide inside the lift and stair cores, so every lettable corner stays glazed and open.
Detail The Louvre As Structure
The screen hangs from primary edge beams designed in from the start, not from brackets added later.
The Project, As Built
Completed structure, photographed on site.



Client Testimonial
Feedback from Project Director after handover.

One floor every four days, and the facade team never waited. That is the whole reason the tower opened on the date we promised.
Frequently Asked Questions
Common questions from buyers specifying this building type.
Why steel rather than a concrete frame?
Programme. A steel frame with metal deck lets the slab follow the columns immediately, so a floor lands every four days instead of every seven to ten. On a fourteen-storey tower that difference is measured in months of rental income.
Is exposed steel acceptable in an office?
In the podium and plant areas, yes. Galvanised members need no paint and no maintenance, and the deck soffit can be left visible. Lettable floors get a suspended ceiling and the structure disappears.
How is the frame detailed for earthquakes?
Perimeter moment frames plus braced bays inside the cores, with the metal deck acting as a diaphragm. Connections are detailed for the drift case, not just for gravity.
Who designs the curtain-wall brackets?
We do. Primary edge beams carry the bracketry from the start, so the facade contractor fixes to a steel line that was designed for it rather than to a cast-in channel added later.
Can the tower be extended or re-planned?
Floor plates can be re-planned internally because the frame carries load on a regular grid. Adding storeys later is not realistic; a steel frame is designed once for its final height.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam