Commercial Steel Buildings · Singapore

120,000 m² Multi-Tower High-Rise Commercial Hub

Fabricated in Commercial & Tech Corridor. Protective coating, shop assembly. Completed 2.5 Weeks Ahead of BCA Master Plan.

120,000 m²Floor Area
16,800 tSteel Tonnage
42 mSkybridge Span
0%Site Rework

Project Facts

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
LocationCommercial & Tech Corridor, Singapore
Construction TypeComposite Concrete-Filled Tube (CFT) & Steel Cores
Project Scale120,000 sqm GFA; ~16,800 Tons Heavy Steel
Design & ExecutionVertical camber/plumbness tolerance < 1/1500
Delivery ResultCompleted 2.5 Weeks Ahead of BCA Master Plan
IndustryMulti-Tower Commercial Hub & Tech Campus
Our ScopeFabrication, protective coating, shop assembly and delivery

Project Overview

How the structure was engineered, fabricated and delivered in Commercial & Tech Corridor.

Constructing a sprawling commercial and tech complex featuring multiple interconnected mid-to-high-rise towers in land-scarce Singapore is an operational tightrope walk.

The EPC director’s primary operational fear was dual-layered: Singapore Building and Construction Authority (BCA) and Ministry of Manpower (MOM) safety standards leave zero room for uncertified welds, while extreme urban traffic constraints completely outlawed roadside component staging.

Any delay in hoisting would incur massive LTA road fines and bleed tens of thousands of dollars per shift in specialized mobile crane rentals.

Crucially, multi-level pedestrian skybridges linking the separate towers demanded that the heavy concrete-filled tube (CFT) columns and steel core trusses maintain near-zero vertical drift, or the long-span aerial bridges simply would not pin together.

120,000 sqm Multi-Tower High-Rise Commercial Hub in Singapore: Sub-Millimeter Core Alignment & Skybridge Precision Under Strict BCA Standards

Four Decisions That Made It Work

01

Sub-Millimeter Verticality for Flawless Br

Controlled plumbness across all core column splices within 1/1500 using continuous shop 3D laser-tracker matching, guaranteeing 42-meter aerial skybridges

02

100% Pre-Drilled, Zero-Hot-Work Connection

Every joint arrived pre-milled and CNC-drilled, eliminating on-site flame cutting and welding to completely bypass MOM hot-work permit bottlenecks in the c

03

Zero-Staging Urban JIT Logistics

Components were packed in containerized sets matching crane-hook hourly schedules, allowing direct offloading from transport flatbeds straight to high-rise

04

Strict BCA-Compliant Traceability

Each member shipped with complete mill test certificates (MTR), third-party ultrasonic (UT) weld records, and weatherproof QR identity tags, clearing local

Client Testimonial

Feedback recorded from the client after handover.

Fabrication and installation team at project handover
“

Lifting a 42-meter skybridge in downtown Singapore leaves zero margin! Shijie nailed the core alignment—pinned on the first drop!

Kelvin TanSenior Project Director, Commercial Complex (Singapore)
120,000 m²16,800 t42 m

Frequently Asked Questions

Answers engineers ask before committing to a scope like this.

What was delivered for this Singapore commercial hub?

Heavy structural steel for a multi-tower commercial and tech campus of about 120,000 sqm gross floor area on roughly 16,800 tons of steel, including composite concrete-filled tube and steel cores plus 42-metre column-free inter-tower skybridges.

Vertical camber and plumbness are controlled within 1/1500 across all core column splices, verified by continuous shop 3D laser-tracker matching. A 42-metre aerial bridge landing on two independently built towers leaves no allowance for accumulated error.

Multi-directional PTFE sliding spherical bearings at the bridge interfaces absorb differential settlement and lateral sway, so the connecting pins are not twisted as the towers move relative to each other.

Components were packed in containerised sets matched to the tower crane’s hourly hook schedule, with a minute-by-minute loading sequence so each truck unloads directly into a lift position within about 30 minutes. Roadside storage is simply not available under LTA enforcement.

None. Every joint arrives pre-milled and CNC-drilled, which bypasses MOM hot-work permit bottlenecks in the city centre, removes fire watch obligations, and eliminates weld-induced distortion on high-altitude splices.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001