150MW Utility-Scale Solar PV
Fabricated in Tropical Plains. Zn-Al-Mg coating, bolted trial assembly. Handed over 28 Days Ahead of TNB COD Deadline.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | Utility-Scale Ground Solar PV & CSP Mountings |
|---|---|
| Location | Tropical Plains, Peninsular Malaysia |
| Project Scale | 150MWp Capacity (~8,500 Tons Structural Steel) |
| Design & Execution | 100% Pre-Drilled Slotted Bolting (0% Field Welding) |
| Service Environment | Zinc-Aluminum-Magnesium (Zn-Al-Mg $310\text{g/m}^2$) |
| Delivery Result | Handed over 28 Days Ahead of TNB COD Deadline |
| Our Scope | Fabrication, Zn-Al-Mg coating, bolted trial assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in Tropical Plains.
Situated across expansive tropical laterite plains in Malaysia, this mega renewable energy complex integrates high-density utility solar PV arrays with an industrial parabolic trough solar thermal (CSP) demonstration loop.
For the EPC consortium, commercial viability hinged on the non-negotiable Commercial Operation Date (COD) set by utility off-taker Tenaga Nasional Berhad (TNB).
In utility-scale solar, missing the grid-connection window triggers severe liquidated damages (LAD) and jeopardizes long-term Power Purchase Agreement (PPA) tariffs.
Dimensions, codes, inspection rates and schedule outcomes for this project are recorded in the Project Facts table above, so they can be checked before an enquiry is issued.

Four Decisions That Made It Work
Zn-Al-Mg Cut-Edge Self-Healing Defense
Utilizing high-grade Zn-Al-Mg alloy steel with exceptional chloride and humidity barrier properties, forming a dense protective film that self-heals cut ed
Micro-Crack Resistant Torsional Rigidity
Engineered triangulated cold-formed framing with deep-flange purlins, suppressing dynamic fluttering under severe tropical squalls to protect delicate sola
$\pm 1.0\text{mm}$ Sub-Millimeter CSP Ther
Parabolic mirror frames feature thermal-expansion decoupling bearings, maintaining laser-guided focal concentration under extreme heat cycling.
Foolproof Slotted Fast-Track Erection
All connection plates feature CNC-machined slotted holes with embedded calibration marks, enabling local unskilled labor to erect tables rapidly without fi
The Project, As Built
Completed works, structural details and the delivery team on site.






Client Testimonial
Feedback recorded from the client after handover.
Missing TNB's grid COD means crippling liquidated damages, while tropical moisture rusts cheap brackets fast. Shijie eliminated all risk: 8,500 tons of Zn-Al-Mg solar steel bolted aloft with zero welding, resisting violent storm gusts with zero panel micro-cracks. Handing over 28 days early secured our PPA tariffs effortlessly.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What was supplied for this Malaysian renewable project?
About 8,500 tons of structural steel for a 150MWp utility-scale ground-mounted solar array combined with an industrial parabolic trough CSP demonstration loop, on tropical laterite plains in Peninsular Malaysia.
Why Zn-Al-Mg coating rather than ordinary galvanizing?
Because the failure mode in tropical humidity is red rust starting at cut edges and punched holes. Zinc-aluminium-magnesium alloy at 310 g/m2 forms a dense protective film that self-heals at exposed cut edges, which is where standard galvanizing gives up first.
Tropical squalls flex mounting tables and crack wafers. How is that prevented?
Triangulated cold-formed framing with deep-flange purlins limits dynamic table deflection to 1/250 under 42 m/s gusts. The bracing resists the fluttering that repeated wind suction induces – a static wind check alone does not capture it.
The CSP loop needs optical precision, not just strength. What tolerance is held?
Parabolic mirror frames are aligned to within plus or minus 1.0mm on the focal line, with thermal-expansion decoupling bearings maintaining that alignment through daily heat cycling. A concentrated solar field loses output when the frame moves, so tolerance is a performance spec.
Can local labour erect this quickly?
Yes. All connection plates have CNC-machined slotted holes with embedded calibration marks, so crews assemble without field cutting or torches. The array was handed over 28 days ahead of the TNB commercial operation date, which is the deadline that carries liquidated damages.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam