Solar Power Solutions · Peninsular Malaysia

150MW Utility-Scale Solar PV

Fabricated in Tropical Plains. Zn-Al-Mg coating, bolted trial assembly. Handed over 28 Days Ahead of TNB COD Deadline.

150 MWpInstalled Capacity
8,500 tSteel Tonnage
42 m/sWind Rating
28 DaysDelivered Early

Données du projet

Les éléments commerciaux et techniques qu'un entrepreneur vérifie avant de demander les plans.

Informations et caractéristiques techniques du projet
IndustrieUtility-Scale Ground Solar PV & CSP Mountings
LieuTropical Plains, Peninsular Malaysia
Project Scale150MWp Capacity (~8,500 Tons Structural Steel)
Conception et réalisation100% Pre-Drilled Slotted Bolting (0% Field Welding)
Environnement de serviceZinc-Aluminum-Magnesium (Zn-Al-Mg $310\text{g/m}^2$)
Delivery ResultHanded over 28 Days Ahead of TNB COD Deadline
Notre champ d'actionFabrication, Zn-Al-Mg coating, bolted trial assembly and delivery

Présentation du projet

How the structure was engineered, fabricated and delivered in Tropical Plains.

Situated across expansive tropical laterite plains in Malaysia, this mega renewable energy complex integrates high-density utility solar PV arrays with an industrial parabolic trough solar thermal (CSP) demonstration loop.

For the EPC consortium, commercial viability hinged on the non-negotiable Commercial Operation Date (COD) set by utility off-taker Tenaga Nasional Berhad (TNB).

In utility-scale solar, missing the grid-connection window triggers severe liquidated damages (LAD) and jeopardizes long-term Power Purchase Agreement (PPA) tariffs.

Dimensions, codes, inspection rates and schedule outcomes for this project are recorded in the Project Facts table above, so they can be checked before an enquiry is issued.

Systèmes de montage hybrides pour une centrale solaire photovoltaïque et à concentration (CSP) de 150 MW en Malaisie : C5-M – protection anticorrosion de qualité marine, résistance à la soulèvement par les vents violents et raccordement accéléré au réseau TNB

Quatre décisions décisives

01

Zn-Al-Mg Cut-Edge Self-Healing Defense

Utilizing high-grade Zn-Al-Mg alloy steel with exceptional chloride and humidity barrier properties, forming a dense protective film that self-heals cut ed

02

Micro-Crack Resistant Torsional Rigidity

Engineered triangulated cold-formed framing with deep-flange purlins, suppressing dynamic fluttering under severe tropical squalls to protect delicate sola

03

$\pm 1.0\text{mm}$ Sub-Millimeter CSP Ther

Parabolic mirror frames feature thermal-expansion decoupling bearings, maintaining laser-guided focal concentration under extreme heat cycling.

04

Foolproof Slotted Fast-Track Erection

All connection plates feature CNC-machined slotted holes with embedded calibration marks, enabling local unskilled labor to erect tables rapidly without fi

Témoignage du client

Commentaires recueillis auprès du client après la remise du projet.

Équipe de fabrication et de montage lors de la remise du projet
“

Missing TNB's grid COD means crippling liquidated damages, while tropical moisture rusts cheap brackets fast. Shijie eliminated all risk: 8,500 tons of Zn-Al-Mg solar steel bolted aloft with zero welding, resisting violent storm gusts with zero panel micro-cracks. Handing over 28 days early secured our PPA tariffs effortlessly.

Ahmad RazakProject Director, Renewable Energy EPC Consortium (Malaysia)
150 MWp8,500 t42 m/s

Questions fréquentes

Les questions que se posent les ingénieurs avant de s'engager dans un projet de cette envergure.

What was supplied for this Malaysian renewable project?

About 8,500 tons of structural steel for a 150MWp utility-scale ground-mounted solar array combined with an industrial parabolic trough CSP demonstration loop, on tropical laterite plains in Peninsular Malaysia.

Because the failure mode in tropical humidity is red rust starting at cut edges and punched holes. Zinc-aluminium-magnesium alloy at 310 g/m2 forms a dense protective film that self-heals at exposed cut edges, which is where standard galvanizing gives up first.

Triangulated cold-formed framing with deep-flange purlins limits dynamic table deflection to 1/250 under 42 m/s gusts. The bracing resists the fluttering that repeated wind suction induces – a static wind check alone does not capture it.

Parabolic mirror frames are aligned to within plus or minus 1.0mm on the focal line, with thermal-expansion decoupling bearings maintaining that alignment through daily heat cycling. A concentrated solar field loses output when the frame moves, so tolerance is a performance spec.

Yes. All connection plates have CNC-machined slotted holes with embedded calibration marks, so crews assemble without field cutting or torches. The array was handed over 28 days ahead of the TNB commercial operation date, which is the deadline that carries liquidated damages.

Obtenez votre devis et votre plan de coûts en 24 heures

Découvrez combien vous pouvez économiser en tonnage d'acier et en frais de transport maritime avant le début de la fabrication

8–15%

Réduction du poids de l'acier

La modélisation 3D 1:1 dans Tekla optimise les rapports poutre-poteau afin d'éliminer les coûts liés aux matériaux superflus.

0,0 mm

Vérification de code sans conflit

Vérifié conformément à la norme EN 1090 et aux charges locales dues au vent et aux séismes.

100%

Revue d'ingénieur à ingénieur

Vérifié par nos ingénieurs en chef — Aucun appel commercial insistant, uniquement des données exploitables et des prix d'usine.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Guichet « Ingénierie et recherche »

Ingénieurs en chef en ligne

Dessins
Dessins

🔒 100 % confidentiel et sécurisé, sans spam