48,000 m² Hyperscale Supercomputing Data Center
Fabricated in Singapore. Epoxy coating, bolted trial assembly. Completed 30 Days Early.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | Hyperscale Data Center |
|---|---|
| Location | Singapore |
| Construction Type | Heavy Steel Frame |
| Project Scale | 48,000 sqm Floor Area |
| Service Environment | ISO C4 Epoxy |
| Delivery Result | Completed 30 Days Early |
| Our Scope | Fabrication, epoxy coating, bolted trial assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in Singapore.
Located in the tech hub of Singapore, this 48,000 sqm hyperscale supercomputing data center is the backbone of the region's AI infrastructure. Speed to market is paramount; any delay costs millions in lost cloud revenue.
Developers harbor intense anxieties regarding structural integrity under the colossal weight of rooftop cooling systems, vibration transmission to sensitive servers, and concrete dust. Shijie Heavy Industry eradicated these operational fears by delivering a high-precision structural steel framework.
Utilizing advanced 3D BIM clash detection and off-site prefabrication, we eliminated hazardous welding and wet concrete. Our engineered steel frame safely supports extreme floor loads and massive chiller arrays, employing integrated dampeners to neutralize vibrations.
Coated to resist relentless tropical humidity, the framework was erected entirely through high-strength bolted connections. This ultra-fast assembly allowed structural handover 30 days ahead of schedule.

Four Decisions That Made It Work
Heavy Mechanical Support
The robust steel skeleton is engineered to bear the extreme loads of massive rooftop cooling towers essential for AI.
Vibration Isolation
Strategic dampening systems prevent intense mechanical vibrations from transferring into sensitive server rack environments.
Ultra-Clean Erection
Fully prefabricated bolted connections eliminated hazardous welding sparks and concrete dust, ensuring a pristine site for parallel server deployment.
Tropical Durability
Advanced multi-layer industrial epoxy coatings relentlessly resist Singapore's year-round equatorial humidity, guaranteeing structural lifespan.
The Project, As Built
Completed works, structural details and the delivery team on site.





Client Testimonial
Feedback recorded from the client after handover.
Deploying an AI-ready hyperscale data center in Singapore requires absolute precision and speed. Concrete construction generates too much dust and takes too long to cure. Shijie Heavy Industry transformed our strategy.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What was built for this Singapore data center?
A 48,000 sqm hyperscale AI computing facility on a high-precision structural steel frame, designed to carry the concentrated floor and rooftop plant loads that dense GPU halls impose rather than the loads of a conventional warehouse.
AI halls concentrate enormous weight on a small footprint. What capacity is provided?
The structural frame carries floor loading of 15 kN/sqm and above, with the roof structure sized separately for the cooling plant. Point loads from racks and from rooftop units are the governing case, not average distributed load.
Rotating plant transmits vibration into server racks. How is that isolated?
Tuned elastomeric dampening nodes are built into the heavy wide-flange framing, so mechanical vibration from chillers and air handling is absorbed at the structure instead of propagating into the hall. Servers and their cabling dislike continuous micro-movement more than they dislike load.
Why build this in steel rather than concrete?
Concrete brings curing time, formwork cycles and dust – none of which suit a project chasing cloud revenue. Off-site fabricated steel with 100% bolted dry erection keeps the site clean enough for parallel server deployment and removes the waiting.
Singapore's humidity attacks steel. What coating is used?
A multi-layer industrial epoxy system to ISO C4, appropriate for a tropical indoor environment with year-round condensation risk. Coating maintenance access in a live data center is difficult, so the barrier has to be right at installation.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam