Industrial Steel Buildings

48,000 m² Hyperscale Supercomputing Data Center

Fabricated in Singapore. Epoxy coating, bolted trial assembly. Completed 30 Days Early.

48,000 m²Floor Area
15 kNLoad
30 DaysDelivery
100%Bolted Assembly

Project Facts

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
IndustryHyperscale Data Center
LocationSingapore
Construction TypeHeavy Steel Frame
Project Scale48,000 sqm Floor Area
Service EnvironmentISO C4 Epoxy
Delivery ResultCompleted 30 Days Early
Our ScopeFabrication, epoxy coating, bolted trial assembly and delivery

Project Overview

How the structure was engineered, fabricated and delivered in Singapore.

Located in the tech hub of Singapore, this 48,000 sqm hyperscale supercomputing data center is the backbone of the region's AI infrastructure. Speed to market is paramount; any delay costs millions in lost cloud revenue.

Developers harbor intense anxieties regarding structural integrity under the colossal weight of rooftop cooling systems, vibration transmission to sensitive servers, and concrete dust. Shijie Heavy Industry eradicated these operational fears by delivering a high-precision structural steel framework.

Utilizing advanced 3D BIM clash detection and off-site prefabrication, we eliminated hazardous welding and wet concrete. Our engineered steel frame safely supports extreme floor loads and massive chiller arrays, employing integrated dampeners to neutralize vibrations.

Coated to resist relentless tropical humidity, the framework was erected entirely through high-strength bolted connections. This ultra-fast assembly allowed structural handover 30 days ahead of schedule.

48,000 sqm Hyperscale Supercomputing Data Center in Singapore: Heavy-Duty Rigidity, Vibration Control, and Accelerated Delivery

Four Decisions That Made It Work

01

Heavy Mechanical Support

The robust steel skeleton is engineered to bear the extreme loads of massive rooftop cooling towers essential for AI.

02

Vibration Isolation

Strategic dampening systems prevent intense mechanical vibrations from transferring into sensitive server rack environments.

03

Ultra-Clean Erection

Fully prefabricated bolted connections eliminated hazardous welding sparks and concrete dust, ensuring a pristine site for parallel server deployment.

04

Tropical Durability

Advanced multi-layer industrial epoxy coatings relentlessly resist Singapore's year-round equatorial humidity, guaranteeing structural lifespan.

Client Testimonial

Feedback recorded from the client after handover.

Fabrication and installation team at project handover
“

Deploying an AI-ready hyperscale data center in Singapore requires absolute precision and speed. Concrete construction generates too much dust and takes too long to cure. Shijie Heavy Industry transformed our strategy.

David L.VP of APAC Data Center Infrastructure
48,000 m²15 kN30 Days

Frequently Asked Questions

Answers engineers ask before committing to a scope like this.

What was built for this Singapore data center?

A 48,000 sqm hyperscale AI computing facility on a high-precision structural steel frame, designed to carry the concentrated floor and rooftop plant loads that dense GPU halls impose rather than the loads of a conventional warehouse.

The structural frame carries floor loading of 15 kN/sqm and above, with the roof structure sized separately for the cooling plant. Point loads from racks and from rooftop units are the governing case, not average distributed load.

Tuned elastomeric dampening nodes are built into the heavy wide-flange framing, so mechanical vibration from chillers and air handling is absorbed at the structure instead of propagating into the hall. Servers and their cabling dislike continuous micro-movement more than they dislike load.

Concrete brings curing time, formwork cycles and dust – none of which suit a project chasing cloud revenue. Off-site fabricated steel with 100% bolted dry erection keeps the site clean enough for parallel server deployment and removes the waiting.

A multi-layer industrial epoxy system to ISO C4, appropriate for a tropical indoor environment with year-round condensation risk. Coating maintenance access in a live data center is difficult, so the barrier has to be right at installation.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam