48,000 m² Hyperscale Supercomputing Data Center
Fabricated in Singapore. Epoxy coating, bolted trial assembly. Completed 30 Days Early.
Datos del proyecto
Los aspectos comerciales y técnicos que un contratista comprueba antes de solicitar los planos.
| Sector | Centro de datos a hiperescala |
|---|---|
| Ubicación | Singapore |
| Tipo de construcción | Heavy Steel Frame |
| Project Scale | 48,000 sqm Floor Area |
| Entorno de servicio | ISO C4 Epoxy |
| Delivery Result | Completed 30 Days Early |
| Nuestro ámbito de actuación | Fabrication, epoxy coating, bolted trial assembly and delivery |
Descripción del proyecto
How the structure was engineered, fabricated and delivered in Singapore.
Located in the tech hub of Singapore, this 48,000 sqm hyperscale supercomputing data center is the backbone of the region's AI infrastructure. Speed to market is paramount; any delay costs millions in lost cloud revenue.
Developers harbor intense anxieties regarding structural integrity under the colossal weight of rooftop cooling systems, vibration transmission to sensitive servers, and concrete dust. Shijie Heavy Industry eradicated these operational fears by delivering a high-precision structural steel framework.
Utilizing advanced 3D BIM clash detection and off-site prefabrication, we eliminated hazardous welding and wet concrete. Our engineered steel frame safely supports extreme floor loads and massive chiller arrays, employing integrated dampeners to neutralize vibrations.
Coated to resist relentless tropical humidity, the framework was erected entirely through high-strength bolted connections. This ultra-fast assembly allowed structural handover 30 days ahead of schedule.

Cuatro decisiones clave
Heavy Mechanical Support
The robust steel skeleton is engineered to bear the extreme loads of massive rooftop cooling towers essential for AI.
Vibration Isolation
Strategic dampening systems prevent intense mechanical vibrations from transferring into sensitive server rack environments.
Ultra-Clean Erection
Fully prefabricated bolted connections eliminated hazardous welding sparks and concrete dust, ensuring a pristine site for parallel server deployment.
Tropical Durability
Advanced multi-layer industrial epoxy coatings relentlessly resist Singapore's year-round equatorial humidity, guaranteeing structural lifespan.
El proyecto construido
Obras finalizadas, detalles estructurales y el equipo de ejecución en la obra.





Testimonio del cliente
Comentarios del cliente recogidos tras la entrega.
Deploying an AI-ready hyperscale data center in Singapore requires absolute precision and speed. Concrete construction generates too much dust and takes too long to cure. Shijie Heavy Industry transformed our strategy.
Preguntas frecuentes
Preguntas que se plantean los ingenieros antes de comprometerse con un proyecto de este alcance.
What was built for this Singapore data center?
A 48,000 sqm hyperscale AI computing facility on a high-precision structural steel frame, designed to carry the concentrated floor and rooftop plant loads that dense GPU halls impose rather than the loads of a conventional warehouse.
AI halls concentrate enormous weight on a small footprint. What capacity is provided?
The structural frame carries floor loading of 15 kN/sqm and above, with the roof structure sized separately for the cooling plant. Point loads from racks and from rooftop units are the governing case, not average distributed load.
Rotating plant transmits vibration into server racks. How is that isolated?
Tuned elastomeric dampening nodes are built into the heavy wide-flange framing, so mechanical vibration from chillers and air handling is absorbed at the structure instead of propagating into the hall. Servers and their cabling dislike continuous micro-movement more than they dislike load.
Why build this in steel rather than concrete?
Concrete brings curing time, formwork cycles and dust – none of which suit a project chasing cloud revenue. Off-site fabricated steel with 100% bolted dry erection keeps the site clean enough for parallel server deployment and removes the waiting.
Singapore's humidity attacks steel. What coating is used?
A multi-layer industrial epoxy system to ISO C4, appropriate for a tropical indoor environment with year-round condensation risk. Coating maintenance access in a live data center is difficult, so the barrier has to be right at installation.
Obtén tu presupuesto y plan de costos en 24 horas
Descubre cuánto puedes ahorrar en tonelaje de acero y en flete marítimo antes de que comience la fabricación
Reducción del peso del acero
El modelado 3D 1:1 de Tekla optimiza las relaciones viga-columna para eliminar los costos de material redundante.
Verificación de código sin conflictos
Se ha verificado de acuerdo con la norma EN 1090 y las cargas eólicas y sísmicas locales.
Revisión de ingeniero a ingeniero
Verificado por nuestros ingenieros principales: sin llamadas de ventas agresivas, solo datos útiles y precio de fábrica.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Ingenieros principales en línea
🔒 100 % privado y seguro, sin spam