53,200 m² Steel Fabrication Plant
Five crane-served bays on 24 m spans , fume extraction built into the ridge, and a coating system chosen for coastal air.
Project Facts
Facts a contractor checks first: Steel fabrication · plate cutting, welding, blasting, painting - Hot-dip galvanised portal frames with crane runway beams, Five halls, 53,200 m² total.
| Industry | Steel fabrication · plate cutting, welding, blasting, painting - heavy plate handled overhead, not by forklift |
|---|---|
| Construction type | Hot-dip galvanised portal frames with crane runway beams - 24 m bays, 12.5 m to the eave |
| Project scale | Five halls, 53,200 m² total - two halls with 20 t overhead travelling cranes |
| Location | Coastal industrial zone, Angola - salt air, high dust load, 500 mm annual rain |
| Collaborators | Process consultant · crane supplier · local erection contractor - runway beams set out to the crane supplier's tolerances |
| Delivery | 35 weeks on site - frames, runway beams, cladding and ventilation |
| Our scope | Structural design and 3D modelling · hot-dip galvanised portal frames · crane runway beams and brackets · purlins and girts · 0.6 mm profiled roof and wall sheeting · ridge ventilator bases · spark-arresting roof detail over the cutting bays · high-level wall louvres · roller shutters and personal doors · box gutters and downpipes · erection drawings and site support |
Project Overview
SynJect designed and supplied the structural steel package for a 53,200 m² steel fabrication plant in Angola — five halls in a single campus, the two largest carrying 20 t overhead travelling cranes. Warm off-white cladding, cream roof sheeting, and a thin oxide-brown edge that reads as a line rather than a colour.
SynJect designed and supplied the structural steel package for a 53,200 m² steel fabrication plant in Angola — five halls in a single campus, the two largest carrying 20 t overhead travelling cranes. Warm off-white cladding, cream roof sheeting, and a thin oxide-brown edge that reads as a line rather than a colour.
In a fabrication hall the crane decides everything. Runway beams on 24 m spans set the column grid, the bracket geometry and the tolerance the crane supplier will hold the installer to; the frame was modelled around those tolerances before a single member was rolled. Plate comes in at one end, leaves as a welded assembly at the other, and never touches a forklift.
Welding and plasma cutting produce fume and sparks in the same bay, and they want opposite things: fume wants to leave high, sparks want to be stopped before they reach the roof sheet. The bays carry ridge ventilator bases sized to the extraction rate, and the cutting bays have a spark-arresting detail under the sheeting rather than a generic roof build-up.
The site is coastal, so galvanising does the work paint cannot: 85 µm on the primary frame, thicker at the eaves where salt settles. Photographed as handed over — runways clear, floors swept, the crane rails waiting for the crane.

Four Decisions That Made It Work
Set The Grid To The Crane
24 m runway spans fixed the column positions, so the crane supplier's tolerances were designed in, not negotiated later.
Fume Out At The Ridge
Ventilator bases sized to the extraction rate, on the ridge, so welding fume leaves above the working zone.
Spark Arrest Before The Sheet
Cutting bays get a spark-arresting layer under the roof, because a stray spark finds the one gap a general build-up leaves.
Galvanise For Salt Air
85 µm on the frame and more at the eaves, where salt-laden air settles and paint would fail first.
The Project, As Built
Completed structure, photographed on site.





Client Testimonial
Feedback from Operations Director after handover.

The runways were right the first time. That is the only thing that mattered to us on this build.
Frequently Asked Questions
Common questions from buyers specifying this building type.
Does the 53,200 m² figure include the office?
It covers the five fabrication halls measured to the outside face of the cladding. The two-storey office and workshop block is priced separately, as are the external works and the cranes themselves.
How are the crane runway tolerances set?
From the crane supplier’s specification, not from a default. Rail centres, bracket levels and column deflection limits were fixed in the 3D model before fabrication, which is why the rails went down without packing.
Can a second crane be added later?
Only if the frame was sized for it. Here two halls carry 20 t cranes and three are crane-free; adding a crane to one of the three would mean replacing columns, not bolting on a beam.
What stops sparks reaching the roof?
A spark-arresting layer under the sheeting over the cutting and plasma bays, plus gutters detailed so slag cannot collect. A general roof build-up is not enough over a cutting table.
How is fume handled in the welding bays?
Ridge ventilator bases sized to the extraction rate, with high-level wall louvres for make-up air. Local extraction at the torches is the operator’s package and was designed around, not duplicated.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam