80 m Clear-Span Footwear Factory
53,400 m² of production floor with no column in the line — ridge monitors for ventilation and cladding fixed for cyclone uplift.
Project Facts
Facts a contractor checks first: Footwear assembly · cutting, stitching, lasting, packing - Hot-dip galvanised rigid frames with tapered rafters, Two production blocks, 53,400 m² total.
| Industry | Footwear assembly · cutting, stitching, lasting, packing - linear flow, no obstruction in the aisle |
|---|---|
| Construction type | Hot-dip galvanised rigid frames with tapered rafters - 80 m clear span, 8.2 m to the eave |
| Project scale | Two production blocks, 53,400 m² total - each block 252 m long |
| Location | Coastal industrial estate, Madagascar - cyclone belt, 1,500 mm annual rain |
| Collaborators | Process engineer · local civil contractor · cladding installer - roof and wall packages from one supplier |
| Delivery | 37 weeks on site - frames, cladding, monitors and rainwater |
| Our scope | Structural design and 3D modelling · hot-dip galvanised rigid frames and tapered rafters · purlins and girts · high-reflectance roof sheeting · corrugated wall cladding · continuous ridge monitors · cyclone-rated fixings and closure details · box gutters and downpipes · roller shutters and personal doors · louvred wall ventilators · erection drawings and site support |
Project Overview
SynJect supplied the structural steel package for a 53,400 m² footwear factory in Madagascar — two production blocks, each 252 m long and 80 m wide, with a clear height of 8.2 m to the eave. Cool off-white cladding, pale blue-grey roof, and a narrow navy base band that stops at the precast plinth.
SynJect supplied the structural steel package for a 53,400 m² footwear factory in Madagascar — two production blocks, each 252 m long and 80 m wide, with a clear height of 8.2 m to the eave. Cool off-white cladding, pale blue-grey roof, and a narrow navy base band that stops at the precast plinth.
The process decides the frame. Cutting, stitching, lasting and packing run in sequence along one axis, and a single column anywhere in that axis breaks the conveyor route. So the halls are 80 m clear spans rather than two bays of forty: the rafters are deeper and the tonnage is higher, but the line runs uninterrupted from one end to the other.
Madagascar's east coast means two things at once: heat that makes a metal roof a radiant ceiling, and cyclones that test every fixing. The roof is a pale high-reflectance sheet to keep the surface cooler, and every cladding fixing and closure is rated for uplift rather than for the prevailing wind. Ventilation needs no fans: continuous monitors on the ridge let hot air leave at the top while louvres at the base draw it in.
Photographed as handed over — roof seams continuous, monitors aligned along both ridges, aprons swept. The two blocks share one rainwater system, sized so a tropical downpour leaves the apron dry within minutes.

Four Decisions That Made It Work
One 80 m Span, Not Two Of Forty
A column on the centre line would cut the conveyor route. Deeper rafters cost less than a re-routed line.
Monitors On The Ridge, Not Fans
Buoyancy does the work: hot air leaves at the ridge, make-up air enters through base louvres.
Fix For Cyclone Uplift
Cladding and closures rated to the suction case, not the prevailing wind, because that is what removes roofs here.
A Roof That Reflects
A pale high-reflectance sheet keeps the underside cooler, which is a labour question as much as an energy one.
The Project, As Built
Completed structure, photographed on site.






Client Testimonial
Feedback from Plant Engineering Manager after handover.

Eighty metres with nothing in the middle. The line runs end to end and the monitors keep the floor workable.
Frequently Asked Questions
Common questions from buyers specifying this building type.
Does the 53,400 m² figure include the office?
It covers the two production blocks measured to the outside face of the cladding. The attached two-storey office and the external works are separate packages, priced separately in the BOQ so a phased build can start with production only.
Why not two 40 m spans with a centre column?
Because the conveyor route runs down the middle. A centre column would force the line to divert around it, which costs more in process layout than the extra rafter depth costs in steel.
How do the ridge monitors work?
They are raised boxes along the ridge with louvred sides. Hot air collects at the highest point and leaves through them, while louvres low in the walls admit make-up air. No fans, no power, no maintenance beyond cleaning.
Is the roof rated for cyclones?
Yes. Cladding, fixings and closures are specified to the uplift case rather than to the prevailing wind speed, and the eave and ridge details are the ones that hold a sheet down in suction, not the ones that look neatest.
Can the same frame carry a crane later?
The two blocks were designed without crane provision. A crane-ready version needs heavier columns and a runway beam bracket designed in at the start; retrofitting it means replacing the columns rather than adding to them.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam