Industrial Steel Buildings · Argentina

32,000 m² Automotive Assembly Plant, Phase 1, Argentina

A 2,100 t long-span steel frame opens the first column-free assembly hall of a staged automotive plant in Argentina. Floor area is an engineering estimate derived from the structural steel tonnage and the building grid.

2,100 tStructural steel
6 baysRepeated roof grid
42 weeksOn site
1 phaseStaged delivery

Project Facts

Facts a contractor checks first: Automotive assembly and body production - Single-storey long-span portal frame with repeated roof planes, 2,100 t of fabricated structural steel in phase 1.

Project facts and specifications
IndustryAutomotive assembly and body production - welding, painting and final assembly lines
Construction typeSingle-storey long-span portal frame with repeated roof planes - warm off-white cladding, pale olive-grey bands, oxide-brown vertical fins
Project scale2,100 t of fabricated structural steel in phase 1 - six repeated roof bays over one assembly hall
LocationPampas industrial site, Argentina - temperate open grassland, strong wind, seasonal heavy rain
CollaboratorsLocal civil works · assembly line supplier - frame set around the bay grid and the phased site boundary
Delivery42 weeks on site - phase 1 envelope closed before line installation
Our scopeStructural design and 3D modelling · long-span portal frames · secondary steel and roof bracing · silver-grey roof sheeting with gutters · warm off-white wall cladding with pale olive-grey bands · oxide-brown vertical fins and window trims · high-level window bands · loading openings · phase 1 end-frame detailing · erection drawings and site support

Project Overview

A car plant grows in phases, so the first frame has to be complete and extendable at the same time.

SynJect supplied 2,100 tonnes of structural steel for phase 1 of an automotive assembly plant in Argentina, built as six repeated long-span roof bays over one column-free hall. Welding, body and final assembly lines sit under a single uninterrupted roof, with no internal column in the conveyor path.

The frame follows one repeated grid. Purlin centres, cladding profile and the oxide-brown vertical fins stay identical from the first bay to the last, so phase 2 can continue the same envelope without a step in the roof line. High-level window bands bring daylight down the length of the hall.

The open Pampas site drives the detailing: shallow roof falls and continuous eave gutters shed seasonal downpours clear of the loading openings, sealed warm off-white cladding with gasketed trims keeps driven rain out, and every lintel and downpipe is galvanized against the exposed grassland wind.

Completed phase 1 automotive assembly plant in Argentina with long silver-grey roof planes and warm off-white cladding

Four Decisions That Made It Work

01

Repeated Bay Grid

Six identical bays keep frames and sheets standard.

02

Column-Free Hall

Conveyors run without an internal column in the way.

03

Extendable End Frame

Phase 2 continues the same roof line.

04

Rain-Ready Roof

Sized gutters shed seasonal Pampas downpours.

Client Testimonial

Feedback from Plant Programme Director after handover.

SynJect erection crew in hard hats holding a red company banner on the paved forecourt of the completed automotive assembly plant in Argentina
Fabrication and installation team on site
“

Phase 1 had to stand on its own and still be the first six bays of a much bigger plant. One grid did both jobs.

Plant Programme DirectorAutomotive manufacturer, Argentina
2,100 t structural steelSix repeated long-span baysColumn-free assembly hall

Frequently Asked Questions

Common questions from buyers specifying this building type.

How is phase 1 of an automotive assembly plant in Argentina quoted?

Phase 1 of an automotive assembly plant in Argentina is quoted against an itemised bill of quantities rather than a flat rate per square metre, because clear span, bay count, eave height, conveyor loads, Pampas wind and rainfall loads, window band extent, coating specification and delivery distance all change the steel tonnage that SynJect has to fabricate and ship. The BOQ separates primary frames, secondary steel, roof and wall sheeting, window bands, loading openings, end-frame detailing, trims, fasteners and coatings so each line can be compared between bidders. Send SynJect the bay schedule, clear span and site location and the quantities come back itemised against those inputs.

The steel package for the phase 1 hall in Argentina covers structural design and 3D modelling, the six long-span portal frames, secondary steel and roof bracing, silver-grey roof sheeting with continuous gutters, warm off-white cladding with pale olive-grey bands, oxide-brown vertical fins, high-level window bands, loading openings and the extendable end frame as one coordinated supply. Earthworks, foundations, the floor slab, conveyor and robotic equipment, glazing, painting and ventilation plant, utilities and fire systems sat outside that package on this project. The table below shows the boundary as it was applied on the delivered hall. In the steel package Outside the package Long-span frames, bracing and secondary steel Earthworks, foundations and floor slab Roof sheeting, wall cladding, gutters and trims Conveyors, robots and process equipment Window bands, loading openings, end frame Glazing, painting plant and ventilation 3D model, shop drawings and erection drawings Local erection labour, cranes and permits

A steel assembly plant in Argentina is designed to the local authority load requirements together with internationally recognised steel design standards for the frames, connections and coatings. For the delivered phase 1 hall, the design basis recorded open grassland wind exposure, seasonal rainfall, conveyor and equipment suspension loads and the coating assumptions used for the temperate site. Every SynJect project is modelled in 3D before fabrication, so connection schedules and code checks stay traceable from model to shop drawing. Ask for the design basis report with the BOQ and the assumptions are visible before cutting starts.

Fabrication, shipping and erection for an Argentina assembly plant run as one coordinated sequence: SynJect fabricates and trial-assembles the repeated frames at the works, ships members in erection order, and hands the site team a crane study plus marked erection drawings before the first lift. On phase 1, the whole envelope was closed before conveyor installation, so the line equipment arrived onto a dry slab. The sequencing plan, crane study and erection drawings are part of the SynJect package, so local contractors price lifts against drawings.

Long-span bays suit automotive assembly because conveyors, body fixtures and robotic cells are re-laid frequently and cannot be planned around closely spaced columns. Six repeated bays also keep rafter sections, purlin centres and cladding panels identical, which shortens fabrication and makes phase 2 a simple continuation. Equipment suspension loads were built into the frame design from the start, so line changes do not trigger a structural review. A dense grid would fix the line layout early and reduce the usable floor plate for every later model change.

Seasonal rain and open-grassland wind in the delivered Argentina hall are handled at roof and wall level: shallow roof falls drive heavy rain into continuous eave gutters, downpipes drop clear of every loading opening, sealed warm off-white cladding with gasketed trims keeps driven rain out, and the bracing grid takes the unobstructed wind exposure of the Pampas site. High-level window bands admit daylight without putting large glazed areas at the windward corners. Gutter and downpipe positions were fixed in the 3D model before fabrication, so they never clash with conveyor hangers.

The floor slab and conveyor foundations at an assembly plant sit outside the SynJect steel package and are delivered by the local civil and line-installation contractors against our hold-down and suspension details. On the Argentina hall, slab levels, equipment loads and hanger positions were agreed between the packages before the slab was specified. The line supplier sets the conveyor geometry, not the frame, so the interface has to be signed off early. Request the interface drawing set with the BOQ and the steel-to-slab boundary becomes unambiguous.

The 2,100 t figure covers all fabricated structural steel in phase 1 of the delivered project in Argentina: the six long-span portal frames, secondary steel and bracing, roof structure, window band framing, loading openings and the extendable end frame. Roof sheeting and wall cladding are scheduled separately in the BOQ. Quoting steel this way makes bids directly comparable, because one supplier cannot hide roof steel outside the tonnage. Ask any bidder to split primary frames and secondary steel in the same manner before comparing offers.

Phase 1 of this Argentina plant ends with a removable future-extension frame rather than a permanent braced wall, because phase 2 is intended to continue the same hall. Roof sheeting, cladding, window band height and purlin centres all run to one grid, so the next bays join without a step in the roof line or a new end wall. The temporary end cladding is a light sealed panel, not a structural braced wall, so it can be taken down without touching the primary frame. SynJect recorded the phase 2 assumptions in the design basis, including the extra bay loads and future downpipe positions.

More bays can be added after handover at the phase 1 end frame, which was detailed as a removable future-extension frame with bolted rather than welded connections. Every roof sheet, cladding panel, window band and purlin centre follows the same grid, so the extension continues the envelope with no step in the roof line. SynJect recorded the extension sequence in the erection drawings so the temporary end panel can be removed without disturbing the completed hall. Confirm phase 2 in the first BOQ and the end-frame connections are fabricated ready for it.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam