85,000 m² LEED-Platinum Textile Plant
Fabricated in Dhaka EPZ Industrial Belt. Protective coating, bolted trial assembly. Handed over 22 Days Ahead of Monsoon Production Window.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | Green Textile & Garment Export Complex |
|---|---|
| Location | Dhaka EPZ Industrial Belt, Bangladesh |
| Construction Type | Continuous North-Light Sawtooth Daylight Truss Systems |
| Project Scale | 85,000 sqm Complex (~12,500 Tons Structural Steel) |
| Design & Execution | 100% Pre-Engineered Bolted Connections (0% Field Welding) |
| Delivery Result | Handed over 22 Days Ahead of Monsoon Production Window |
| Our Scope | Fabrication, protective coating, bolted trial assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in Dhaka EPZ Industrial Belt.
Located inside a certified Export Processing Zone (EPZ) near Dhaka, Bangladesh, this mega garment and textile campus houses high-density automated cutting halls, sewing workshops, and export staging centers for global apparel brands.
For the international garment manufacturer and general contractor, the project was bound to strict global buyer audits and tight seasonal production deadlines.
Following international workplace safety initiatives (RSC Accord), Western fashion buyers mandate zero-tolerance fire-separation, structural load testing, and progressive collapse prevention before awarding clothing contracts.
Dimensions, codes, inspection rates and schedule outcomes for this project are recorded in the Project Facts table above, so they can be checked before an enquiry is issued.

Four Decisions That Made It Work
Monsoon-Proof Continuous Stainless Interna
Engineered deep-draw 304 stainless-steel internal valley gutters with integrated secondary weir relief outlets, guaranteeing rapid sheet-flow drainage duri
Glare-Free Sawtooth Natural Daylight Optim
Multi-span north-light sawtooth steel trusses maximize uniform natural illumination across sewing floors, minimizing color-matching errors on textiles and
RSC Accord & LEED-Platinum Certified Rigid
Steel frames underwent dynamic seismic and progressive collapse modeling, using factory-certified high-strength structural members to pass international co
Foolproof Pre-Engineered 100% Bolted Assem
All connections were pre-machined using multi-axis CNC punching with guide dowels and coded with tear-proof QR barcodes, enabling local crews to erect the
The Project, As Built
Completed works, structural details and the delivery team on site.




Client Testimonial
Feedback recorded from the client after handover.
In Bangladesh, failing an RSC audit or suffering internal gutter overflows ruins garment export contracts instantly. Shijie eliminated both risks: 85,000 sqm of sawtooth steel bolted together seamlessly with zero torch cuts, holding 100% bone-dry during violent monsoon storms.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What does this 85,000 sqm EPZ campus in Dhaka contain?
A garment and textile complex inside a certified Export Processing Zone near Dhaka, comprising high-density automated cutting halls, sewing workshops and export staging centres on roughly 12,500 tons of structural steel, built to LEED Platinum and RSC Accord criteria.
Western buyers audit fire safety before placing orders. How does the structure comply?
Frames were modelled for seismic action and progressive collapse prevention, and connections are 100% pre-machined and bolted with factory-applied high-build C4 coatings. No site welding means no burnt coatings and no hot-work fire risk during erection – both of which are audit findings.
Multi-span sawtooth roofs are notorious for internal gutter overflow. How is that solved?
Drainage runs in deep-draw continuous 304 stainless box gutters with integrated secondary weir relief outlets and exterior siphonic downspouts, sized for torrential monsoon intensity. A secondary path means a blocked outlet does not become a flooded sewing floor.
How were tens of thousands of components kept in order on site?
Every member carries a colour-coded waterproof QR barcode matched to bay-by-bay erection drawings, so parts are hook-lifted directly off container flatbeds. That removes ground sorting, which is where multi-building steel projects usually lose weeks.
How did the schedule relate to the monsoon?
Handover came 22 days ahead of the monsoon production window. Missing that window would have pushed commissioning into the rains, when internal water damage risk and labour availability both worsen.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam