Industrial Steel Buildings · Malaysia

65,000 m² Multi-Story Cleanroom Fab

Fabricated in Penang Tech Park. Protective coating, bolted trial assembly. Handover 45 Days Early.

65,000 m²Floor Area
100% BoltedAssembly
45 Days EarlyDelivery
Dry AssemblyBuild Type

Project Facts

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
IndustryMulti-Story Cleanroom Fab
LocationPenang Tech Park, Malaysia
Construction TypeHeavy Rigid Steel Frame
Project Scale65,000 sqm Total Floor Area
Delivery ResultHandover 45 Days Early
VibrationMicro-Vibration Dampening
Our ScopeFabrication, protective coating, bolted trial assembly and delivery

Project Overview

How the structure was engineered, fabricated and delivered in Penang Tech Park.

Located in Malaysia's semiconductor hub, this 65,000 sqm multi-story cleanroom workshop is the epicenter for advanced electronics. Missing a market supercycle costs billions, making speed to market the absolute priority.

Developers fear two catastrophic risks: micro-vibrations destroying wafer yields, and construction dust delaying cleanroom certifications. Shijie Heavy Industry eradicated these nightmares with a high-precision, vibration-isolated multi-story steel framework.

Utilizing BIM, we engineered heavy floors equipped with dampening nodes to neutralize mechanical vibrations. Employing a 100% prefabricated bolted dry assembly, we entirely bypassed hazardous welding and concrete dust.

This ultra-clean strategy allowed parallel installation of highly sensitive filtration systems. Topping out 45 days early empowered our client to capture immediate tech profits.

65,000 sqm Multi-Story Cleanroom Fab in Malaysia: Micro-Vibration Control & Dry Assembly

Four Decisions That Made It Work

01

65,000 sqm Multi-Story Cleanroom Fab in Ma

Micro-Vibration Control & Dry Assembly

02

Micro-Vibration Isolation

Heavy composite floor structures feature integrated dampening technologies, neutralizing kinetic vibrations to protect highly sensitive semiconductor manuf

03

Ultra-Clean Dry Assembly

The prefabricated, bolted skeleton eliminates hazardous welding sparks and concrete dust, creating an impeccably clean site for concurrent high-tech equipm

04

Heavy Floor Load Capacity

Engineered with robust wide-flange columns, the multi-story framework effortlessly supports the colossal weight of intensive cleanroom filtration units and

Client Testimonial

Feedback recorded from the client after handover.

Completed 65,000 sqm Multi-Story Cleanroom Fab in Malaysia: Micro-Vibration Control & Dry Assembly with the SynJect fabrication and installation team at handover
Fabrication and installation team at project handover
“

Executing a multi-story semiconductor plant in Malaysia requires a flawless structural foundation. Micro-vibrations are lethal to yields, and certification delays cost millions. Shijie Heavy Industry completely transformed our expansion strategy.

Richard W.VP of Manufacturing, APAC Semiconductor Group
65,000 m²45 Days Early100% Bolted

Frequently Asked Questions

Answers engineers ask before committing to a scope like this.

What is this 65,000 sqm facility in Penang used for?

A multi-storey cleanroom fabrication and workshop building in Malaysia’s semiconductor hub, providing total floor area across several levels for advanced electronics production and the heavy filtration and process equipment that supports it.

Heavy moment frames are combined with tuned dampening nodes in the floor structure, so kinetic energy from plant and equipment is absorbed rather than amplified up through the building. Standard high-rise framing does the opposite and makes the problem worse.

Yes, with the right section sizes. Robust wide-flange columns and heavy composite floors are sized for the concentrated weight of filtration units, process tools and service distribution, which is a different design case from office loading.

The frame is 100% prefabricated and bolted on site, so there are no welding fumes and no concrete dust generated during erection. Cleanroom commissioning can start earlier because the envelope is not being contaminated while it is being built.

Avoiding wet construction removed the curing and stripping cycles that normally dominate a multi-storey programme. High-strength bolted connections with slip-critical detailing still deliver the stiffness a tall building needs, and factory-controlled hole geometry keeps behaviour consistent across thousands of joints. Modular erection kept the critical path in the factory and in crane time.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam