Steel Warehouse · Tanzania

75,000 m² Port Transit Bulk Store

Fabricated in Coastal Port Zone. C5-M coating, bolted trial assembly. Handover 35 Days Early.

75,000 m²Floor Area
80 mClear Span
100%Bolted Assembly
35 DaysDelivery

Project Facts

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
IndustryPort Transit Bulk Warehouse
LocationCoastal Port Zone, Tanzania
Construction TypeLong-Span Portal Steel Frame
Project Scale75,000 sqm Total Floor Area
Service EnvironmentC5-M Marine Epoxy Polyurethane
Delivery ResultHandover 35 Days Early
Our ScopeFabrication, C5-M coating, bolted trial assembly and delivery

Project Overview

How the structure was engineered, fabricated and delivered in Coastal Port Zone.

Situated at a major Tanzanian port, this 75,000 sqm bulk transit warehouse is the ultimate logistical artery for East Africa. In port management, cargo throughput speed is paramount.

Port authorities harbor anxieties regarding three threats: devastating salt-spray corrosion, restrictive interior columns slowing down loaders, and roof failures during coastal storms. Shijie Heavy Industry eradicated these fears by engineering a specialized long-span portal steel frame.

Referencing the layout seen in 1 (1)_7.jpg, the blue-roofed sheds are strategically aligned to maximize dockside efficiency. By pre-fabricating robust wide-flange beams, we created a massive column-free interior allowing dump trucks to operate freely, accelerating cargo turnover.

To combat the Indian Ocean climate, the steel skeleton is protected by a premium C5-M marine-grade anti-corrosion coating system, guaranteeing zero-maintenance durability. Assembled entirely via high-strength bolts, the framework was erected rapidly without disrupting active port operations, delivering the facility 35 days early.

75,000 sqm Long-Span Port Transit Bulk Warehouse in Tanzania: Marine Anti-Corrosion and High-Throughput Logistics

Four Decisions That Made It Work

01

Unobstructed Logistics Span

The 80-meter column-free clear span provides immense interior volume, allowing uninterrupted maneuverability for heavy bulk loaders and trucks.

02

Marine-Grade Shielding

A rigorous C5-M heavy anti-corrosion epoxy system provides an impenetrable armor against the Indian Ocean's highly saline, humid atmosphere.

03

Coastal Storm Resilience

Aerodynamic roof profiling and reinforced portal frames effortlessly dissipate extreme wind loads generated by severe coastal monsoons.

04

Zero-Disruption Assembly

Precision CNC-machined bolted nodes enabled ultra-fast field erection, strictly avoiding any operational interference with the active port.

Client Testimonial

Feedback recorded from the client after handover.

Fabrication and installation team at project handover
“

Managing a critical transit hub in Tanzania requires absolute logistical efficiency. Coastal salt spray usually eats through standard steel sheds rapidly, and interior columns constantly slow down loaders. Shijie Heavy Industry understood our fears.

Jonathan M.Port Authority Logistics Operations Director
75,000 m²80 m35 Days

Frequently Asked Questions

Answers engineers ask before committing to a scope like this.

What did SynJect build at this Tanzanian port?

A 75,000 sqm bulk transit warehouse on a long-span portal steel frame with an 80 m column-free interior width, so loaders and dump trucks can turn and stack without weaving around columns.

A C5-M marine epoxy-polyurethane system over a Sa 2.5 blast, with stripe coats on every weld, cut edge and bolt head. Dry film thickness is measured on each batch, because pinholes at edges are where marine corrosion starts.

The roof profile is aerodynamic and the portal frames are reinforced for the site’s coastal wind load, with purlin spacing and fixing patterns set for uplift rather than gravity load alone. Coastal storm loading governed the design, not the crane loads.

Yes. All fabrication happened off site and the frame is 100% high-strength bolted, with no field welding, cutting or hot work permits. Erection ran alongside live cargo handling, so the terminal never lost a berth window.

No internal columns means free circulation for heavy loaders, more usable stack height and faster truck turnaround per shift. Combined with modular erection, the warehouse was handed over 35 days early.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam