Steel Public Building · Algeria

45,000 m² Algeria Stadium Space Frame

Fabricated in Algiers Urban Center. C5-M coating, bolted trial assembly. Canopy Topped Out 35 Days Early.

45,000 m²Floor Area
280 mClear Span
65,000 SeatsStadium Seats
100%Bolted Connections

Project Facts

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
IndustryNational Stadium Space Frame Roof
LocationAlgiers Urban Center, Algeria
Construction TypeMulti-Layer Tubular Space Frame
Project Scale65,000 Seats, 45,000 sqm Roof Area
Service EnvironmentC5-M Marine Epoxy Polyurethane
Delivery ResultCanopy Topped Out 35 Days Early
Our ScopeFabrication, C5-M coating, bolted trial assembly and delivery

Project Overview

How the structure was engineered, fabricated and delivered in Algiers Urban Center.

Located in the bustling urban heart of Algiers, this monumental 65,000-seat stadium features a state-of-the-art steel space frame roof. For national-level sports infrastructure, government clients harbor deep anxieties regarding structural safety under seismic activity, severe Mediterranean salt-fog corrosion, and the terrifying prospect of missing the opening deadline for international games.

Shijie Heavy Industry engineered a massive tubular space frame structure to bypass these fears. By pre-fabricating thousands of precision spherical nodes and tubular members in our advanced facilities, we enabled rapid, error-free modular assembly on-site.

The lightweight yet incredibly rigid space frame arches elegantly over the grandstands without a single obstructive column. Coated with marine-grade anti-corrosion barriers, it resists the harsh coastal climate.

We hoisted the entire canopy structure 35 days ahead of the inflexible schedule, delivering an enduring civic icon.

Algeria Stadium Space Frame Roof: 65,000-Seat Mega Span, Seismic Resilience, and Accelerated Delivery

Four Decisions That Made It Work

01

Algeria Stadium Space Frame Roof

65,000-Seat Mega Span, Seismic Resilience, and Accelerated Delivery

02

Massive Clear Span

The space frame arches 280 meters, providing 65,000 spectators with a 100% column-free viewing experience.

03

Seismic & Wind Resilience

Multi-layered spatial node geometry efficiently distributes high seismic forces and Mediterranean wind loads.

04

Marine-Grade Longevity

A rigorous C5-M coating system protects the steel web from Algiers's humid, salt-heavy atmosphere.

Client Testimonial

Feedback recorded from the client after handover.

Fabrication and installation team at project handover
“

Hosting the upcoming international games meant our construction deadline was absolutely non-negotiable. Building a 65,000-seat stadium roof in a densely populated urban zone like Algiers is an immense logistical challenge. Shijie Heavy Industry took the weight off our shoulders.

Youssef M.Ministry of Sports Lead Infrastructure Director
45,000 m²280 m100%

Frequently Asked Questions

Answers engineers ask before committing to a scope like this.

What is the roof structure of this Algiers stadium?

A multi-layer tubular space frame canopy covering 45,000 sqm over a 65,000-seat bowl, with a 280-metre unobstructed major span, built from precision spherical bolted nodes and tubular members.

Hydraulic strand jacking lifts entire pre-assembled roof segments from below, so cranes do not need to reach over the seating bowl. Segments are assembled at ground level where access is easy and then raised as blocks.

That is exactly why the frame is a lightweight, high-yield steel space frame: it distributes seismic and wind forces through multi-directional node geometry while keeping the dead load on the substructure low. Mass is the enemy in seismic design.

A C5-M marine epoxy and polyurethane system, specified because the canopy is permanently exposed to humid, salt-bearing coastal air rather than sheltered inside a building.

The canopy was topped out 35 days early, which protects the commissioning window for pitch, lighting and broadcast systems. On a national stadium tied to an international fixture, that buffer is the difference between a finished venue and a postponed event.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam