Steel Public Building · Thailand

1,860 m² Steel Trampoline Park

A column-free play floor under one 30 m span — trampoline beds, a foam pit and a café mezzanine, all in a single steel envelope.

1,860 m²Play floor
30 mClear span
11Attractions
6 weeksOn site

Project Facts

Facts a contractor checks first: Indoor trampoline and adventure park - Clear-span steel frame, warm white insulated panels, 1,860 m², 30 m by 62 m.

Project facts and specifications
IndustryIndoor trampoline and adventure park - trampoline beds, foam pit, dodgeball, café
Construction typeClear-span steel frame, warm white insulated panels - flat roof with low parapet
Project scale1,860 m², 30 m by 62 m - mezzanine café over the entrance
LocationTropical urban outskirts, Thailand - monsoon rain, high humidity
CollaboratorsPark operator · attraction supplier · local fit-out crew - attraction loads agreed before fabrication
Delivery6 weeks - open before the school holidays
Our scopeStructural design and 3D modelling · 30 m clear-span steel frame · insulated wall and roof panels · mezzanine framing for the café · attraction fixing points · erection drawings and site support

Project Overview

SynJect supplied a 1,860 m² pre-engineered steel trampoline park on the outskirts of a Thai city — a 30 m by 62 m clear-span hall holding trampoline beds, a foam pit, dodgeball courts and a café mezzanine over the entrance.

SynJect supplied a 1,860 m² pre-engineered steel trampoline park on the outskirts of a Thai city — a 30 m by 62 m clear-span hall holding trampoline beds, a foam pit, dodgeball courts and a café mezzanine over the entrance.

The span is the business case. With no internal columns, the operator can re-plan attractions between seasons without touching the structure, and parents on the mezzanine can see the whole floor.

The envelope is detailed for the tropics: insulated panels, a ventilated roof void and a low parapet that hides the plant, with wide glazing keeping the play floor daylit through the monsoon.

Photographed at completion: the park from the apron and from the air, the play hall, the foam pit and the café counter before opening day.

Front elevation of the steel trampoline park in Thailand with warm white cladding and a flat roof behind a low parapet

Four Decisions That Made It Work

01

Span It Clear

30 m without a column keeps every attraction in one sight line and lets the layout change later.

02

Fix Attractions To The Frame

Swing, dodgeball and climbing loads were agreed with the supplier before fabrication.

03

Float The Café

A mezzanine over the entrance puts seating above the services and keeps the ground floor for play.

04

Build For The Monsoon

Insulated panels, a ventilated roof void and wide eaves handle heat, humidity and driving rain.

Client Testimonial

Feedback from Park Operator after handover.

SynJect erection crew in hard hats holding a red company banner on the apron of the steel trampoline park in Thailand
Fabrication and installation team on site
“

No columns means no blind spots. We re-planned the floor twice before opening and never touched the steel.

Park OperatorIndoor adventure park, Thailand
1,860 m² play floor30 m clear spanMezzanine café

Frequently Asked Questions

Common questions from buyers specifying this building type.

How big a span can you clear?

30 m clear on this hall; longer spans are framed as multi-span with columns on the attraction grid.

Yes. Fixing points and loads are agreed with the attraction supplier before fabrication.

Insulated panels, a ventilated roof void and wide eaves keep solar gain down; the play floor stays daylit.

Clear-span frame, insulated panels, mezzanine framing, fixing points, erection drawings and site support.

Fourteen weeks from slab to opening on this site, including the mezzanine and the envelope.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam