Industrial Steel Buildings · Mozambique

42,000 m² Rolling Mill Hall

Two bays over a rebar line, 22 m to the eave for crane and furnace clearance, roofed for radiant heat and framed for mill vibration.

42,000 m²Under roof
22 mEave height
36 mBay span
45 weeksOn site

Project Facts

Facts a contractor checks first: Long products · rebar and wire rod rolling - Heavy hot-dip galvanised frames with plate girders, Two production halls, 42,000 m² total.

Project facts and specifications
IndustryLong products · rebar and wire rod rolling - hot billet in, cooled bar out
Construction typeHeavy hot-dip galvanised frames with plate girders - 36 m bays, 22 m to the eave
Project scaleTwo production halls, 42,000 m² total - mill line 410 m end to end
LocationInland industrial park, Mozambique - high ambient heat, dust, seasonal rain
CollaboratorsMill equipment supplier · civil consultant · erection contractor - foundations set to the mill supplier's load map
Delivery45 weeks on site - frame, runway beams, cladding and roof ventilation
Our scopeStructural design and 3D modelling · heavy galvanised frames and plate girders · crane runway beams · purlins and girts · heat-tolerant roof sheeting over the furnace bay · continuous ridge ventilators · spark and scale screens · high-level wall louvres · roller shutters and mill access doors · box gutters and downpipes · erection drawings and site support

Project Overview

SynJect designed and supplied the structural steel package for a 42,000 m² rebar rolling mill in Mozambique — two halls, 410 m of mill line, and 22 m to the eave so the crane can lift over the stands. Pale terracotta wall cladding, silver-grey roof sheeting, and a dark brick-red line at the openings only.

SynJect designed and supplied the structural steel package for a 42,000 m² rebar rolling mill in Mozambique — two halls, 410 m of mill line, and 22 m to the eave so the crane can lift over the stands. Pale terracotta wall cladding, silver-grey roof sheeting, and a dark brick-red line at the openings only.

Height is not styling. The reheating furnace, the roughing stands and the crane that services them stack vertically, and a 12 m eave would have forced the crane onto a lower runway with its own column line inside the mill. 22 m to the eave on 36 m bays keeps one crane envelope over the whole line and one column grid under it.

Heat is the second problem. Radiant heat off the bar and the furnace bay reaches the underside of the roof, so the sheeting over the furnace zone is specified for a higher service temperature than the rest of the hall, with a ventilated cavity above the insulation rather than a sealed build-up. Continuous ridge ventilators take the rising air out; high-level louvres on the walls let make-up air in below the crane runway.

Mill vibration is the third. The frames are isolated from the mill foundations so that torque from the stands is not fed into the cladding fixings, and the bracing is arranged to keep the sway frequency away from the drive frequency. Photographed as handed over, before first billet.

Corner of the completed rolling mill hall in Mozambique with pale terracotta ribbed cladding, a darker upper band and two large mill access openings

Four Decisions That Made It Work

01

Height For One Crane Envelope

22 m to the eave keeps a single crane over furnace, stands and cooling bed, instead of a second runway inside the mill.

02

Separate The Mill From The Frame

Frames isolated from the mill foundations, so drive torque does not travel into cladding fixings.

03

A Roof Rated For Radiant Heat

Higher service temperature over the furnace bay, with a ventilated cavity above the insulation.

04

Ventilate Above The Crane

Ridge ventilators plus high-level louvres move furnace heat out without a draught at floor level.

Client Testimonial

Feedback from Mill Project Manager after handover.

SynJect fabrication and installation crew in hard hats holding a red company banner in front of the completed rolling mill hall in Mozambique
Fabrication and installation team on site
“

One crane envelope over the whole line. That is what we asked for and what we got.

Mill Project ManagerLong products producer, Mozambique
22 m eave36 m baysHeat-rated roof

Frequently Asked Questions

Common questions from buyers specifying this building type.

Does the 42,000 m² figure include the furnace bay?

It covers both production halls measured to the outside face of the cladding, the furnace bay included. The water treatment plant and the finished goods yard are separate structures and separate packages.

Because the crane has to lift over the stands and the furnace. A lower eave forces a second runway and a second column line inside the mill, which costs more than the extra steel in the taller frame.

By specifying a higher service temperature for the sheeting over the furnace zone, and by using a ventilated cavity above the insulation rather than a sealed build-up, so heat does not sit against the underside of the sheet.

It would if the frames were tied to the mill foundations. They are isolated, and the bracing is arranged so the frame’s sway frequency stays clear of the drive frequency.

The runway beams and brackets are sized for the crane specified at the time of design. A heavier crane means new runway beams and, in most cases, new columns rather than additional brackets.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam