120,000 m² EV Assembly Plant
Fabricated in Industrial Zone. Fire-rated coating, bolted trial assembly. Handover 45 Days Early.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | EV Assembly & Logistics Plant |
|---|---|
| Location | Industrial Zone, South Africa |
| Construction Type | Heavy Steel Truss Framework |
| Project Scale | 120,000 sqm Manufacturing Facility |
| Service Environment | Fire-Resistant Coating Applied |
| Delivery Result | Handover 45 Days Early |
| Our Scope | Fabrication, fire-rated coating, bolted trial assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in Industrial Zone.
Located in South Africa, this 120,000 sqm complex supports the regional transition to EV manufacturing. Automakers operate on strict schedules, and facility delays impact production targets. Managers face specific engineering challenges: ensuring roofs bear the dynamic loads of overhead conveyors, integrating loading docks for battery logistics, and preventing dust from contaminating active paint shops.
Shijie Heavy Industry addressed these requirements with a high-capacity steel truss system. We integrated a high-density bay of loading docks to streamline inbound logistics for heavy battery packs.
Deep-web trusses were deployed to support suspended loads. The battery zone features specialized fire-resistant coatings to meet safety codes. Inside, a wide column-free grid provides flexibility for automated guided vehicle routing.
Utilizing a pre-engineered bolted assembly method, teams avoided on-site welding and minimized dust. Completing the structure 45 days early provided a reliable foundation for setting up production.

Four Decisions That Made It Work
120,000 sqm EV Assembly Plant in South Afr
Structural Adaptability and Logistics
Load Capacity
Engineered with roof trusses to safely bear the dynamic weight of continuous overhead car conveyors and equipment.
Inbound Logistics
The exterior layout features an array of loading docks, streamlining the intake of heavy EV battery packs.
Agile Span
A wide structural grid provides unobstructed space, facilitating the efficient layout of automated guided vehicles.
The Project, As Built
Completed works, structural details and the delivery team on site.




Client Testimonial
Feedback recorded from the client after handover.

Establishing an EV line in South Africa requires dependable infrastructure. Deflecting conveyors can stall welding lines. Handling batteries also demands efficient logistics.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What was built for this South African EV programme?
A 120,000 sqm manufacturing facility for electric vehicle assembly and logistics in an industrial zone, built on a heavy steel truss framework with a high-density bay of truck loading docks for inbound battery packs.
Overhead conveyors impose moving loads that fatigue ordinary roofs. How is that handled?
The roof structure uses deep-web trusses sized for the dynamic loads of continuous overhead conveyors and suspended equipment, rather than being designed only for dead load and wind. Conveyor support points are coordinated into the truss nodes at design stage.
Does the column grid restrict AGV routing inside?
The structural grid is deliberately wide, keeping the production floor free of intermediate columns so automated guided vehicles can be routed without detours, and so the dock front discharges straight into the storage zone. Span was treated as a functional requirement, not a cost line.
Building next to live production means dust cannot be tolerated. How was that controlled?
Erection was 100% bolted with dry connections, which removes field welding sparks and concrete dust. That protects adjacent paint shop environments where airborne contamination would ruin finished body panels.
How far ahead of programme was the plant handed over?
Forty-five days early. Pre-fabricated trusses and bolted site connections compressed the structural phase, giving the process contractor earlier access to install conveyors and line equipment. Structural steel is also fire-protected to the building’s fire engineering strategy.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam