120,000 m² Textile Industrial Park
Fabricated in Ethiopian Industrial Corridor. Protective coating, bolted trial assembly. Handover 40 Days Ahead of Schedule.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | Textile & Garment Manufacturing Park |
|---|---|
| Location | Ethiopian Industrial Corridor |
| Construction Type | Modular Pre-Engineered Frames |
| Project Scale | 120,000 sqm Standardized Matrix |
| Delivery Result | Handover 40 Days Ahead of Schedule |
| Ventilation | Ridge Vents for Passive Cooling |
| Our Scope | Fabrication, protective coating, bolted trial assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in Ethiopian Industrial Corridor.
Located in Ethiopia's industrial corridor, this 120,000 sqm park provides essential infrastructure for the garment sector. Operators require facilities built rapidly to accommodate tenants.
They face practical engineering considerations: maintaining comfortable temperatures for large workforces without energy-intensive air conditioning, and ensuring consistent quality across dozens of halls. Shijie supplied a modular, pre-engineered portal frame system.
Our design uses continuous natural ridge ventilators and reflective roof panels to manage temperatures via passive cooling. Applying a standardized structural grid streamlined the fabrication and shipping processes.
Utilizing a fully bolted assembly method, teams erected the matrix safely, avoiding on-site welding delays. Finishing the structure 40 days early allowed tenants to install equipment promptly, supporting regional goals.

Four Decisions That Made It Work
120,000 sqm Textile Industrial Park in Eth
Modular Design and Passive Cooling
120,000 sqm Textile Industrial Park in Eth
Modular Design and Passive Cooling
Modular Scalability
A uniform structural grid allows rapid duplication of production halls and simplifies future expansions.
Passive Climate Control
Engineered with continuous ridge monitors, the facilities naturally dissipate heat, ensuring comfortable conditions.
The Project, As Built
Completed works, structural details and the delivery team on site.





Client Testimonial
Feedback recorded from the client after handover.

Developing a textile park in Ethiopia requires practical, scalable infrastructure. Our priority is handing over functional halls to tenants quickly, ensuring facilities are comfortable and sound. Shijie provided a solution aligning perfectly with our needs.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What was built for this Ethiopian garment park?
A 120,000 sqm industrial park for the textile and garment sector in Ethiopia’s industrial corridor, delivered as a matrix of standardised production halls on a modular pre-engineered portal frame system rather than bespoke buildings.
Cooling a garment hall with air conditioning is unaffordable. What is the alternative?
Passive cooling. Continuous ridge ventilators let hot air escape at the roof apex while reflective roof panels limit solar gain, so internal temperature is managed by airflow and surface performance instead of by running chillers all day.
Sewing floors need good light without glare. How is that achieved?
Integrated roof skylights are positioned to deliver diffuse daylight across the production floor, cutting the daytime lighting load. That is a measurable operating cost saving for a tenant running two shifts.
Why does a standardised grid matter for a multi-hall park?
A uniform structural grid lets halls be duplicated without redesign, which shortens fabrication, simplifies shipping and makes future expansion a repeat rather than a new project. It also means the erection crew learns one sequence and repeats it.
How fast was the park handed over, and does bolting really save time?
Forty days ahead of schedule. Components are precision-manufactured and 100% pre-drilled, so site work is bolting rather than welding, with almost no skilled field welding required and no curing time to wait on.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam