Steel Warehouse

60,000 m² Automated Storage Hub

Fabricated in Vietnam Industrial Zone. PU topcoat, bolted trial assembly. Millimeter-Level Tolerance.

60,000 m²Floor Area
100% BoltedAssembly
45 Days EarlyDelivery
SeamlessRoof System

Project Facts

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
IndustryASRS Logistics Warehouse
LocationVietnam Industrial Zone
Construction TypeRack-Clad Building System
Project Scale60,000 sqm Floor Area
Design & ExecutionMillimeter-Level Tolerance
Service EnvironmentTropical Polyurethane Coating
Our ScopeFabrication, PU topcoat, bolted trial assembly and delivery

Project Overview

How the structure was engineered, fabricated and delivered in Vietnam Industrial Zone.

Located in Vietnam's industrial corridor, this 60,000 sqm Automated Storage and Retrieval System (ASRS) hub is the beating heart of local e-commerce logistics. In automated warehousing, investors suffer from paralyzing anxiety over structural deflection. Even a millimeter of steel deformation can jam high-speed robotic stacker cranes, crippling the supply chain.

Furthermore, Vietnam's aggressive monsoons threaten catastrophic water damage and rapid steel corrosion. Shijie Heavy Industry eradicated these nightmares by delivering a rack-clad steel structure with absolute precision.

Utilizing LOD 500 BIM and robotic CNC fabrication, we guaranteed flawless alignment for the automated tracks. We engineered the heavy portal frame to possess extreme rigidity, neutralizing wind shear from typhoons.

Coated with a tropical-grade polyurethane anti-corrosion system, the facility repels relentless moisture. By employing a rapid bolted assembly, we delivered this mega-hub 45 days ahead of schedule, securing the client's ROI.

60,000 sqm Automated Storage and Retrieval System (ASRS) Hub in Vietnam: Millimeter Precision and Typhoon Resilience

Four Decisions That Made It Work

01

Absolute Robotic Precision

The rack-clad framework was fabricated with CNC accuracy, ensuring high-speed robotic stackers operate without jamming risks.

02

Typhoon-Proof Rigidity

The steel skeleton is strictly engineered to withstand Southeast Asian monsoons, preventing structural sway that derails systems.

03

Tropical Moisture Shield

A premium polyurethane coating provides an impenetrable barrier against Vietnam's humidity, securing a rust-free lifespan.

04

Ultra-Fast ROI Generation

Avoiding slow concrete curing, the bolted dry assembly accelerated the schedule, handing over the facility 45 days early.

Client Testimonial

Feedback recorded from the client after handover.

Fabrication and installation team at project handover
“

Deploying an automated warehouse in Vietnam is extremely risky. If the steel frame shifts slightly under wind load, our robotic cranes will crash, costing millions. Shijie Heavy Industry delivered absolute perfection.

Nguyen H.Supply Chain Director, SE Asia
60,000 m²45 Days Early100% Bolted

Frequently Asked Questions

Answers engineers ask before committing to a scope like this.

What is this 60,000 sqm facility in Vietnam?

An automated storage and retrieval system hub for e-commerce logistics in Vietnam’s industrial corridor, built as a rack-clad steel structure so the high-bay racking and the building frame work as one system.

The structure is detailed at LOD 500 in BIM and fabricated on robotic CNC lines, so node positions are accurate before anything reaches site. Field work is bolting of pre-matched components, which keeps the crane rail geometry inside the tolerance the ASRS supplier requires.

Heavy braced frames control lateral sway so the structure does not drift under storm loading, and the roof is a seamless metal system with continuous drainage rather than a lap-jointed sheet roof. Automated cranes and their control electronics cannot tolerate either movement or water ingress.

Not in this case. The racking acts as the primary structure carrying roof and cladding, which removes a parallel steel frame and the floor area it would occupy. The trade-off is fabrication precision, which is why CNC accuracy is the core of the delivery.

Dry bolted assembly removed the concrete curing cycle that normally gates a warehouse programme. For an e-commerce operator, 45 extra days is 45 days of throughput and revenue that a wet-build schedule would have spent waiting for formwork to strike.

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam