60,000 m² Automated Storage Hub
Fabricated in Vietnam Industrial Zone. PU topcoat, bolted trial assembly. Millimeter-Level Tolerance.
Project Facts
The commercial and technical facts a contractor checks before requesting drawings.
| Industry | ASRS Logistics Warehouse |
|---|---|
| Location | Vietnam Industrial Zone |
| Construction Type | Rack-Clad Building System |
| Project Scale | 60,000 sqm Floor Area |
| Design & Execution | Millimeter-Level Tolerance |
| Service Environment | Tropical Polyurethane Coating |
| Our Scope | Fabrication, PU topcoat, bolted trial assembly and delivery |
Project Overview
How the structure was engineered, fabricated and delivered in Vietnam Industrial Zone.
Located in Vietnam's industrial corridor, this 60,000 sqm Automated Storage and Retrieval System (ASRS) hub is the beating heart of local e-commerce logistics. In automated warehousing, investors suffer from paralyzing anxiety over structural deflection. Even a millimeter of steel deformation can jam high-speed robotic stacker cranes, crippling the supply chain.
Furthermore, Vietnam's aggressive monsoons threaten catastrophic water damage and rapid steel corrosion. Shijie Heavy Industry eradicated these nightmares by delivering a rack-clad steel structure with absolute precision.
Utilizing LOD 500 BIM and robotic CNC fabrication, we guaranteed flawless alignment for the automated tracks. We engineered the heavy portal frame to possess extreme rigidity, neutralizing wind shear from typhoons.
Coated with a tropical-grade polyurethane anti-corrosion system, the facility repels relentless moisture. By employing a rapid bolted assembly, we delivered this mega-hub 45 days ahead of schedule, securing the client's ROI.

Four Decisions That Made It Work
Absolute Robotic Precision
The rack-clad framework was fabricated with CNC accuracy, ensuring high-speed robotic stackers operate without jamming risks.
Typhoon-Proof Rigidity
The steel skeleton is strictly engineered to withstand Southeast Asian monsoons, preventing structural sway that derails systems.
Tropical Moisture Shield
A premium polyurethane coating provides an impenetrable barrier against Vietnam's humidity, securing a rust-free lifespan.
Ultra-Fast ROI Generation
Avoiding slow concrete curing, the bolted dry assembly accelerated the schedule, handing over the facility 45 days early.
The Project, As Built
Completed works, structural details and the delivery team on site.





Client Testimonial
Feedback recorded from the client after handover.
Deploying an automated warehouse in Vietnam is extremely risky. If the steel frame shifts slightly under wind load, our robotic cranes will crash, costing millions. Shijie Heavy Industry delivered absolute perfection.
Frequently Asked Questions
Answers engineers ask before committing to a scope like this.
What is this 60,000 sqm facility in Vietnam?
An automated storage and retrieval system hub for e-commerce logistics in Vietnam’s industrial corridor, built as a rack-clad steel structure so the high-bay racking and the building frame work as one system.
A millimetre of frame deflection jams stacker cranes. How is that prevented?
The structure is detailed at LOD 500 in BIM and fabricated on robotic CNC lines, so node positions are accurate before anything reaches site. Field work is bolting of pre-matched components, which keeps the crane rail geometry inside the tolerance the ASRS supplier requires.
Vietnam's monsoons bring both wind sway and roof leakage. How is each handled?
Heavy braced frames control lateral sway so the structure does not drift under storm loading, and the roof is a seamless metal system with continuous drainage rather than a lap-jointed sheet roof. Automated cranes and their control electronics cannot tolerate either movement or water ingress.
Does a rack-clad system still need a separate building frame?
Not in this case. The racking acts as the primary structure carrying roof and cladding, which removes a parallel steel frame and the floor area it would occupy. The trade-off is fabrication precision, which is why CNC accuracy is the core of the delivery.
Why was handover 45 days early, and does that matter?
Dry bolted assembly removed the concrete curing cycle that normally gates a warehouse programme. For an e-commerce operator, 45 extra days is 45 days of throughput and revenue that a wet-build schedule would have spent waiting for formwork to strike.
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam