36,000 m² Climate-Controlled Agro-Processing Complex
Fabricated in Central Agricultural Export Corridor. PU topcoat, shop assembly. Handed Over 21 Days Ahead of Harvest Intake Deadline.
Dados do projeto
Os aspectos comerciais e técnicos que um empreiteiro verifica antes de solicitar os projetos.
| Setor | Climate-Controlled Agro-Processing & Cold Chain |
|---|---|
| Localização | Central Agricultural Export Corridor, Ghana |
| Tipo de construção | Heavy-Duty Single-Span Portal Frame & Extensive Loading Canopy |
| Project Scale | 36,000 sqm GFA (~5,200 Tons Structural Steel) |
| Ambiente de serviço | C4-High Durability (Polyurethane Barrier System) |
| Delivery Result | Handed Over 21 Days Ahead of Harvest Intake Deadline |
| Nosso escopo | Fabrication, PU topcoat, shop assembly and delivery |
Visão geral do projeto
How the structure was engineered, fabricated and delivered in Central Agricultural Export Corridor.
Located in Ghana’s fertile agricultural export belt, this mega agro-processing facility provides continuous climate-controlled sorting, drying, packaging, and cold storage for high-value export produce. For the agro-industrial client and EPC management, the commercial stakes were tightly bound to the seasonal harvest clock.
In equatorial West Africa, intense ambient radiation pushes exterior roof temperatures past +60°C, accompanied by sudden tropical monsoons with torrential rainfall. The primary operational anxiety was structural thermal bridging and envelope leakage.
If the heavy structural steel frame lacked integrated thermal break isolators, radiant heat would bleed into the low-temperature workshops, overloading industrial chillers, skyrocketing electricity costs, and causing condensation dripping that ruins dry produce. Furthermore, the facility demanded an ultra-long cantilevered steel canopy to shelter the intense activity of the multi-bay loading docks from torrential downpours.
Dimensions, codes, inspection rates and schedule outcomes for this project are recorded in the Project Facts table above, so they can be checked before an enquiry is issued.

Quatro decisões decisivas
Integrated Thermal-Bridge Isolation
Pre-engineered high-density elastomeric thermal pads at all structural steel interfaces eliminate radiant heat transmission, preventing internal condensation drips and reducing refrigeration power consumption by up to 25%.
Massive Loading Dock Canopy
An ultra-long, structurally reinforced cantilevered steel canopy shields the entire row of docking bays, ensuring uninterrupted, dry logistics operations even during violent tropical storms.
Estratégia de Combate à Corrosão
C4 coating selected for the service environment recorded in the Project Facts.
Connection Design
100% pre-drilled bolted connections, trialled in the shop, so the frame goes up without site welding.
O projeto construído
Obras concluídas, detalhes estruturais e a equipe de entrega no canteiro de obras.




Depoimento do cliente
Comentários registrados pelo cliente após a entrega.
Building in Ghana meant racing against the harvest window. Any thermal leak aloft would drop condensation and ruin our produce, while misplaced bolt holes would halt remote cranes. Shijie solved it: 36,000 sqm of curved steel bolted aloft with zero torch cuts, holding bone-dry and drip-free during violent rainstorms.
Perguntas frequentes
Perguntas que os engenheiros fazem antes de se comprometerem com um escopo como esse.
What was built for this Ghanaian agro exporter?
A 36,000 sqm climate-controlled processing complex in Ghana’s agricultural export corridor on roughly 5,200 tons of steel, covering sorting, drying, packaging and cold storage for high-value export produce under one envelope.
Roof surfaces hit +60C here. How does that heat stay out of the cold store?
Two measures work together: high-density elastomeric thermal pads at every steel-to-panel interface break the conduction path through the frame, and the envelope is built to U 0.22 W/m2K or better. Without thermal breaks, the steel becomes a radiator inside the cold room.
Why use 48m arch barrel vaults rather than a flat portal frame?
The arch vault spans the sorting and drying halls without internal columns, giving clear operational floor area while keeping foundation loads low. Curved members are formed on 3D CNC pipe benders and laser-verified in the shop so the vault closes cleanly on site.
Torrential West African rain and wind uplift are both risks. How is the roof fixed?
The envelope is a 360-degree double-lock standing seam system with concealed sliding clips, rated above 180mm/h of rainfall. There are no exposed fastener holes, so neither sheet-flow leakage nor wind uplift can start at a fixing point.
Can this be erected where there are no heavy machining tools?
Yes, that was the design premise. All flanged connections are CNC-cut with guide dowels and trial-fitted in 3D at the factory, so site work is first-pass bolting with zero field cutting, reaming, or waiting on a machine shop.
Obtenha o seu BOQ e plano de custos em 24 horas
Veja quanto pode poupar em tonelagem de aço e frete marítimo antes do início da fabricação
Redução do peso do aço
A modelação 3D 1:1 no Tekla otimiza as relações viga-coluna para eliminar custos com material redundante.
Verificação de código sem conflitos
Verificado em conformidade com a norma EN 1090 e com as cargas eólicas e sísmicas locais.
Revisão de Engenheiro para Engenheiro
Verificado pelos nossos engenheiros principais — Sem chamadas de vendas insistentes, apenas dados úteis e preço de fábrica.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Engenheiros-chefe online
🔒 100% privado e seguro, sem spam