Agricultural Steel Sheds · Ghana

36,000 m² Climate-Controlled Agro-Processing Complex

Fabricated in Central Agricultural Export Corridor. PU topcoat, shop assembly. Handed Over 21 Days Ahead of Harvest Intake Deadline.

36,000 m²Floor Area
5,200 tSteel Tonnage
180 mmStorm Proofing
21 DaysTime Saved

Data proyek

Hal-hal teknis dan komersial yang diperiksa oleh kontraktor sebelum meminta gambar.

Fakta dan spesifikasi proyek
IndustriClimate-Controlled Agro-Processing & Cold Chain
LokasiCentral Agricultural Export Corridor, Ghana
Jenis KonstruksiHeavy-Duty Single-Span Portal Frame & Extensive Loading Canopy
Project Scale36,000 sqm GFA (~5,200 Tons Structural Steel)
Lingkungan LayananC4-High Durability (Polyurethane Barrier System)
Delivery ResultHanded Over 21 Days Ahead of Harvest Intake Deadline
Ruang Lingkup KamiFabrication, PU topcoat, shop assembly and delivery

Gambaran umum proyek

How the structure was engineered, fabricated and delivered in Central Agricultural Export Corridor.

Located in Ghana’s fertile agricultural export belt, this mega agro-processing facility provides continuous climate-controlled sorting, drying, packaging, and cold storage for high-value export produce. For the agro-industrial client and EPC management, the commercial stakes were tightly bound to the seasonal harvest clock.

In equatorial West Africa, intense ambient radiation pushes exterior roof temperatures past +60°C, accompanied by sudden tropical monsoons with torrential rainfall. The primary operational anxiety was structural thermal bridging and envelope leakage.

If the heavy structural steel frame lacked integrated thermal break isolators, radiant heat would bleed into the low-temperature workshops, overloading industrial chillers, skyrocketing electricity costs, and causing condensation dripping that ruins dry produce. Furthermore, the facility demanded an ultra-long cantilevered steel canopy to shelter the intense activity of the multi-bay loading docks from torrential downpours.

Dimensions, codes, inspection rates and schedule outcomes for this project are recorded in the Project Facts table above, so they can be checked before an enquiry is issued.

Kompleks Pengolahan Hasil Pertanian Berukuran 36.000 m² dengan Sistem Pengatur Iklim di Ghana: Isolasi Jembatan Termal, Ketahanan terhadap Badai Tropis, dan Serah Terima Proyek Turnkey Jalur Cepat

Empat keputusan penentu

01

Integrated Thermal-Bridge Isolation

Pre-engineered high-density elastomeric thermal pads at all structural steel interfaces eliminate radiant heat transmission, preventing internal condensation drips and reducing refrigeration power consumption by up to 25%.

02

Massive Loading Dock Canopy

An ultra-long, structurally reinforced cantilevered steel canopy shields the entire row of docking bays, ensuring uninterrupted, dry logistics operations even during violent tropical storms.

03

Strategi Penanggulangan Korosi

C4 coating selected for the service environment recorded in the Project Facts.

04

Connection Design

100% pre-drilled bolted connections, trialled in the shop, so the frame goes up without site welding.

Testimoni klien

Umpan balik yang dicatat dari klien setelah serah terima.

Tim fabrikasi dan pemasangan pada saat serah terima proyek
“

Building in Ghana meant racing against the harvest window. Any thermal leak aloft would drop condensation and ruin our produce, while misplaced bolt holes would halt remote cranes. Shijie solved it: 36,000 sqm of curved steel bolted aloft with zero torch cuts, holding bone-dry and drip-free during violent rainstorms.

Kwabena O.Managing Director, Agro-Industrial Logistics Hub (Ghana)
36,000 m²5,200 t180 mm

Pertanyaan umum

Pertanyaan-pertanyaan yang diajukan para insinyur sebelum memutuskan untuk menangani proyek dengan cakupan seperti ini.

What was built for this Ghanaian agro exporter?

A 36,000 sqm climate-controlled processing complex in Ghana’s agricultural export corridor on roughly 5,200 tons of steel, covering sorting, drying, packaging and cold storage for high-value export produce under one envelope.

Two measures work together: high-density elastomeric thermal pads at every steel-to-panel interface break the conduction path through the frame, and the envelope is built to U 0.22 W/m2K or better. Without thermal breaks, the steel becomes a radiator inside the cold room.

The arch vault spans the sorting and drying halls without internal columns, giving clear operational floor area while keeping foundation loads low. Curved members are formed on 3D CNC pipe benders and laser-verified in the shop so the vault closes cleanly on site.

The envelope is a 360-degree double-lock standing seam system with concealed sliding clips, rated above 180mm/h of rainfall. There are no exposed fastener holes, so neither sheet-flow leakage nor wind uplift can start at a fixing point.

Yes, that was the design premise. All flanged connections are CNC-cut with guide dowels and trial-fitted in 3D at the factory, so site work is first-pass bolting with zero field cutting, reaming, or waiting on a machine shop.

Dapatkan BOQ dan Rencana Biaya 24 Jam Anda

Lihat seberapa banyak tonase baja dan biaya pengiriman laut yang dapat Anda hemat sebelum proses fabrikasi dimulai

8–15%

Penghematan Berat Baja

Pemodelan 3D Tekla dengan skala 1:1 mengoptimalkan rasio balok-kolom untuk menghilangkan biaya bahan yang berlebihan.

0,0 mm

Verifikasi Kode Tanpa Konflik

Telah diverifikasi sesuai dengan standar EN 1090 serta beban angin dan gempa setempat.

100%

Tinjauan Antar-Insinyur

Telah diverifikasi oleh para insinyur utama kami—Tanpa panggilan penjualan yang memaksa, hanya data yang dapat ditindaklanjuti dan harga pabrik.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Meja Layanan Teknik & Pertanyaan

Insinyur Utama Online

Gambar
Gambar

🔒 100% Pribadi dan Aman, Tanpa Spam