Aviation & Transport Building · Philippines

80m Clear-Span Arch Space Truss Hangar

Fabricated in Clark Freeport Zone. Hot-dip galvanizing, shop assembly.

80 mClear Span
75 mHangar Depth
270 km/hWind Resistance
0%Site Hot Work

Data proyek

The commercial and technical facts a contractor checks before requesting drawings.

Project facts and specifications
IndustryCommercial Aviation MRO Hub
LocationClark Freeport Zone, Philippines
Construction TypeGround-Supported Arch Space Trusses
Project Scale80m Clear Arch Span × 75m Depth
Service EnvironmentDuplex Galvanizing & Marine Epoxy
FeatureIntegrated Aircraft Tail Notch
Our ScopeFabrication, hot-dip galvanizing, shop assembly and delivery

Gambaran umum proyek

How the structure was engineered, fabricated and delivered in Clark Freeport Zone.

In commercial aviation MRO infrastructure, schedule slippage causes severe aircraft grounding losses and costly liquidated damages. For this wide-body servicing facility in Clark, the contractor faced a strict goal: delivering an 80-meter column-free hangar before the monsoon under Category 5 typhoons (> 270 km/h) and coastal salinity.

Standard boxy hangars act as blunt barriers against violent wind suction. To counter this, the facility adopted ground-supported curved arch space trusses with an integrated tail notch.

The curved geometry guides typhoon gusts smoothly over the building, slashing uplift forces. The tail pocket accommodates stabilizers without elevating overall eaves, minimizing frontal windage.

Dimensions, codes, inspection rates and schedule outcomes for this project are recorded in the Project Facts table above, so they can be checked before an enquiry is issued.

Hanggar Penerbangan dengan Jarak Bebas 80 Meter di Filipina: Dirancang untuk Menahan Topan Kategori 5 dan Memiliki Ketahanan Tinggi terhadap Gempa Bumi

Empat keputusan penentu

01

Aerodynamic Arch Profile

Grounded arch space trusses guide typhoon gusts smoothly across the roof, slashing wind uplift.

02

Tail-Notch Wind Reduction

The specialized roof notch accommodates aircraft stabilizers while keeping main eaves low to reduce windage.

03

Corrosion Strategy

hot-dip galvanizing selected for the service environment recorded in the Project Facts.

04

Connection Design

100% pre-drilled bolted connections, trialled in the shop, so the frame goes up without site welding.

Testimoni klien

Feedback recorded from the client after handover.

Fabrication and installation team at project handover
“

Erecting an 80-meter clear-span hangar in the Philippine typhoon belt required superior aerodynamic efficiency. Boxy hangars act like massive sails in Category 5 storms. Shijie Heavy Industry fabricated an outstanding curved arch space truss structure with an integrated tail notch.

Angelo R.EPC Project Director, Airport Infrastructure (Clark
80 m75 m270 km/h

Pertanyaan umum

Answers engineers ask before committing to a scope like this.

What was built at Clark Freeport for this MRO operator?

An 80-metre column-free clear-span maintenance hangar for wide-body aircraft, built as a double-layer space frame with CNC forged bolted ball joints so the entire enclosure goes up without field cutting, drilling or welding.

To NSCP 2015 Zone 4 with a design wind speed of 270 km/h or above. The double-layer space grid distributes wind uplift across many members instead of concentrating it, and forged ball joints are verified for bidirectional tension-compression fatigue because storm turbulence reverses the load repeatedly.

Upward reverse camber is built into the node geometry from full-load FEA, pre-compensating for the roof’s dead weight and the loads of overhead docking cranes. The structure is level under actual service load, which is the condition the sliding doors operate in.

There are no field-welded connections. Joints are machined in-house and bolted, and the steel carries ASTM A123 hot-dip galvanizing with sealed node caps, applied in the shop where surface preparation can actually be controlled.

The duplex treatment of heavy galvanizing plus salt-spray-resistant coating is specified for a 30-year-plus maintenance-free life in a marine tropical atmosphere. Maintenance access on a hangar roof is expensive, so durability is a lifecycle cost decision.

Dapatkan BOQ dan Rencana Biaya 24 Jam Anda

Lihat seberapa banyak tonase baja dan biaya pengiriman laut yang dapat Anda hemat sebelum proses fabrikasi dimulai

8–15%

Penghematan Berat Baja

Pemodelan 3D Tekla dengan skala 1:1 mengoptimalkan rasio balok-kolom untuk menghilangkan biaya bahan yang berlebihan.

0,0 mm

Verifikasi Kode Tanpa Konflik

Telah diverifikasi sesuai dengan standar EN 1090 serta beban angin dan gempa setempat.

100%

Tinjauan Antar-Insinyur

Telah diverifikasi oleh para insinyur utama kami—Tanpa panggilan penjualan yang memaksa, hanya data yang dapat ditindaklanjuti dan harga pabrik.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Meja Layanan Teknik & Pertanyaan

Insinyur Utama Online

Gambar
Gambar

🔒 100% Pribadi dan Aman, Tanpa Spam