Agricultural Steel Sheds · East Africa

28,000 m² Climate-Controlled Agricultural Hub

Fabricated in Kenya. Protective coating, shop assembly. Delivered 35 Days Ahead.

28,000 m²Floor Area
60 mPortée libre
100 mmThermal Shield
35 DaysCalendrier

Données du projet

Les éléments commerciaux et techniques qu'un entrepreneur vérifie avant de demander les plans.

Informations et caractéristiques techniques du projet
IndustrieClimate-Controlled Agro-Hub
LieuKenya, East Africa
Type de constructionRigid Portal Steel Frame
Project Scale28,000 sqm Floor Area
Delivery ResultDelivered 35 Days Ahead
Portée libre60-Meter Column-Free Space
Notre champ d'actionFabrication, protective coating, shop assembly and delivery

Présentation du projet

How the structure was engineered, fabricated and delivered in Kenya.

Situated within Kenya’s vibrant agricultural belt, this 28,000 sqm climate-controlled facility serves as a vital artery for horticultural exports across East Africa. For agribusiness exporters, temperature variation is the ultimate hazard: equatorial solar radiation causes internal thermal spikes, spoiling delicate flowers and avocados and destroying export value.

Operators are terrified by escalating refrigeration costs, condensation drips contaminating organic produce, and construction delays dragging through seasonal harvest cycles. Shijie Heavy Industry eradicated these operational fears by engineering a specialized portal steel frame with an airtight thermal envelope.

We integrated continuous natural ridge monitors with high-density PIR composite insulation panels, drastically cutting HVAC power consumption. The 60-meter column-free span allows electric forklifts and refrigerated trucks to maneuver through loading docks without bottlenecking.

By utilizing a 100% pre-engineered bolted design, we eliminated field hot work and topped out 35 days early, securing peak seasonal harvest profits.

Pôle agricole climatisé de 28 000 m² au Kenya : enveloppe thermique et montage rapide par vissage

Quatre décisions décisives

01

28,000 sqm Climate-Controlled Agricultural

Thermal Envelope and Rapid Bolted Erection

02

Thermal Envelope Integrity

High-performance PIR composite cladding eliminates thermal bridging, stabilizing temperature zones and slashing daily HVAC operational expenditure.

03

Food-Grade Anti-Drip Roof

Engineered vapor barriers and concealed drainage gutters completely eradicate condensation drips, preserving post-harvest crop freshness and hygiene standa

04

Unobstructed Logistics Span

The 60-meter column-free interior floor optimizes cross-docking workflows, allowing heavy forklifts and delivery fleets to cycle rapidly without collision

Témoignage du client

Commentaires recueillis auprès du client après la remise du projet.

Completed 28,000 sqm Climate-Controlled Agricultural Hub in Kenya: Thermal Envelope and Rapid Bolted Erection with the SynJect fabrication and installation team at handover
Équipe de fabrication et de montage lors de la remise du projet
“

Exporting avocados and flowers to European markets leaves zero margin for refrigeration failure. If our processing center leaks heat or condenses moisture onto produce, entire shipments are rejected at port. Shijie Heavy Industry delivered an incredible structural solution.

David K.Managing Director, East Africa Agro-Logistics
28,000 m²60 m100 mm

Questions fréquentes

Les questions que se posent les ingénieurs avant de s'engager dans un projet de cette envergure.

What was built for this Kenyan horticultural exporter?

A 28,000 sqm climate-controlled processing and distribution hub in Kenya’s agricultural belt, serving flower and avocado exports with a rigid portal steel frame, a 60-metre clear span and twelve integrated cold-chain loading docks.

The enclosure uses airtight 100mm high-density PIR panels with a continuous vapour barrier and concealed drainage gutters, so moisture is controlled at the envelope rather than allowed to condense on the underside of the roof and drip onto produce.

With no internal columns, cross-docking flows freely: forklifts and refrigerated trucks circulate without collision pinch points, and pallet positions can be reconfigured as the harvest profile changes. Column-free floor area is operational flexibility, not architectural vanity.

Yes. PIR composite cladding with eliminated thermal bridging holds the temperature zones stable, so the refrigeration plant cycles less. Airtightness and joint continuity matter more than nominal panel thickness here.

That is exactly why the frame is 100% shop-fabricated and bolted with pre-punched components. Local crews assemble from drawings, crane time is shorter, and there is no dependence on scarce coded welders. Handover came 35 days ahead.

Obtenez votre devis et votre plan de coûts en 24 heures

Découvrez combien vous pouvez économiser en tonnage d'acier et en frais de transport maritime avant le début de la fabrication

8–15%

Réduction du poids de l'acier

La modélisation 3D 1:1 dans Tekla optimise les rapports poutre-poteau afin d'éliminer les coûts liés aux matériaux superflus.

0,0 mm

Vérification de code sans conflit

Vérifié conformément à la norme EN 1090 et aux charges locales dues au vent et aux séismes.

100%

Revue d'ingénieur à ingénieur

Vérifié par nos ingénieurs en chef — Aucun appel commercial insistant, uniquement des données exploitables et des prix d'usine.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Guichet « Ingénierie et recherche »

Ingénieurs en chef en ligne

Dessins
Dessins

🔒 100 % confidentiel et sécurisé, sans spam