Home / Solutions / Industrial Steel Buildings / Petrochemical Equipment Installation Steel Structures
Petrochemical Equipment Installation
100% of critical Complete Joint Penetration (CJP) welds undergo Ultrasonic Testing (UT per ISO 17640 / ASTM E164) or Magnetic Particle Testing (MT per ISO 17638 / ASTM E709). Radiographic Testing (RT) is applied as requested for heavy sections. Weld acceptance conforms strictly to ISO 11666 Acceptance Level 1 or AWS D1.1 criteria. High-performance protective coatings are applied using airless spray technology in compliance with ISO 12944 (C3 to CX corrosive environments), featuring Inorganic/Organic Zinc-Rich Epoxy Primers, Epoxy Micaceous Iron Oxide Intermediate coats, and Polyurethane/Fluorocarbon Topcoats. Dry Film Thickness (DFT) is verified using calibrated magnetic gauges adhering strictly to the 90/10 rule.
Challenges & Solutions
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
Technical Parameters
To be confirmed
| Parameter | What it is set from |
|---|---|
| Structures | To be confirmed |
| Design basis | Shijie Heavy Industry’s engineering team is highly proficient in international design codes, including American Standard (AISC 360), European Standard (EN 1993), Australian Standard (AS 4100), and Chinese Standard (GB 50017). |
| Loads | We rigorously calculate wind, seismic, and snow loads specific to your project’s geographical location to ensure absolute structural safety and regulatory approval. |
| Corrosion protection | High-performance protective coatings are applied using airless spray technology in compliance with ISO 12944 (C3 to CX corrosive environments), featuring Inorganic/Organic Zinc-Rich Epoxy Primers, Epoxy Micaceous Iron Oxide Intermediate coats, and Polyurethane/Fluorocarbon Topcoats. Dry Film Thickness (DFT) is verified using calibrated magnetic gauges adhering strictly to the 90/10 rule. |
| Welding and NDT | Welding is performed exclusively by AWS D1.1 or EN ISO 9606 certified welders using qualified Welding Procedure Specifications (WPS) supported by Procedure Qualification Records (PQR) per AWS D1.1 / ISO 15614. Submerged Arc Welding (SAW) and Flux-Cored Arc Welding (FCAW) dominate Complete Joint Penetration (CJP) and fillet welds. 100% of critical Complete Joint Penetration (CJP) welds undergo Ultrasonic Testing (UT per ISO 17640 / ASTM E164) or Magnetic Particle Testing (MT per ISO 17638 / ASTM E709). Radiographic Testing (RT) is applied as requested for heavy sections. Weld acceptance conforms strictly to ISO 11666 Acceptance Level 1 or AWS D1.1 criteria. |
| Execution class | EN 1090-2 EXC2 (certificate 2787-CPR-01627) |
| Steel grades | We source directly from top-tier state-owned steel mills, ensuring all raw materials—whether H-beams, steel plates, or high-strength bolts—meet strict international mechanical and chemical properties, covering grades like S355, S460, ASTM A36, and A992. Every piece of steel processed in our facility is backed by Mill Test Reports (MTRs) according to EN 10204 Type 3.1. From heat number stamping to final delivery, we guarantee 100% traceability for your peace of mind. |
| Lead time | To be confirmed |
| Documentation | A complete Manufacturing Data Report (MDR)—comprising MTRs, NDT records, coating inspection logs, and Certificates of Conformance—is compiled to support CE Marking (DoP under EN 1090) and AISC final acceptance. |
How Your Project Is Built
To be confirmed
Engineering & Foundation
Utilizing advanced BIM platforms such as Tekla Structures, detailed 3D modeling and shop drawings are executed strictly in compliance with AISC 360 or Eurocode 3 (EN 1993).
- Utilizing advanced BIM platforms such as Tekla Structures, detailed 3D modeling and shop drawings are executed strictly in compliance with AISC 360 or Eurocode 3 (EN 1993).
- To be confirmed
- To be confirmed
Fabrication & Erection
Complex geometries, long-span trusses, and heavy framing undergo 1:1 physical trial assembly or high-precision 3D laser scanning virtual assembly per EN 1090-2 / AISC requirements. Bolt hole alignment is verified (≥ 95% free-pass rate for high-strength bolts), and critical dimensions (span, camber, 3D spatial alignment) are verified within tight tolerance limits (±2.0 mm) to eliminate site fitting risks.
- Complex geometries, long-span trusses, and heavy framing undergo 1:1 physical trial assembly or high-precision 3D laser scanning virtual assembly per EN 1090-2 / AISC requirements.
- To be confirmed
- High-Strength Structural Bolting is executed via calibrated Wrench or Turn-of-Nut methods with 100% torque audit documentation.
Envelope & Handover
A complete Manufacturing Data Report (MDR)—comprising MTRs, NDT records, coating inspection logs, and Certificates of Conformance—is compiled to support CE Marking (DoP under EN 1090) and AISC final acceptance.
- To be confirmed
- A complete Manufacturing Data Report (MDR)—comprising MTRs, NDT records, coating inspection logs, and Certificates of Conformance—is compiled to support CE Marking (DoP under EN 1090) and AISC final acceptance.
- A complete Manufacturing Data Report (MDR)—comprising MTRs, NDT records, coating inspection logs, and Certificates of Conformance—is compiled to support CE Marking (DoP under EN 1090) and AISC final acceptance.
Qualification Certificate
Your projects are protected by world-class standards. From CE (EN 1090) to ISO 9001, our qualifications are not just paper—they are the rigorous daily reality on our shop floor.




Recommended Product Systems
To be confirmed
SynJect Multi-Storey Steel Buildings maximize spatial efficiency and structural integrity for industrial&commercial hubs.
The Portal Frame is the most mature and efficient light steel structure system in global industrial construction today.
SynJect Steel Truss systems deliver unparalleled heavy load-bearing capacity and clear-span flexibility.
SynJect Envelope & Cladding Systems seal your structures with superior thermal performance and weatherproofing.
Related Projects
To be confirmed
Frequently Asked Questions
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam