Industrial Steel Buildings · Kenya

Мукомольный завод площадью 15 000 м², Кения

A single roof over milling, packing and bagged storage keeps grain intake and flour dispatch on one continuous production floor in Kenya.

15 000 м²Под крышей
4 silosGalvanized grain storage
1,280 tStructural steel
39 weeksНа месте

Данные проекта

Facts a contractor checks first: Flour milling and grain storage - Low-pitched multi-bay portal frames with attached milling tower, 15,000 m² under roof, four silos and one domed bin.

Сведения о проекте и технические характеристики
ПромышленностьFlour milling and grain storage - intake, milling, packing and bagged dispatch on one site
Тип конструкцииLow-pitched multi-bay portal frames with attached milling tower - misty blue-grey cladding, silver-grey roofs, navy accents
Масштаб проекта15,000 m² under roof, four silos and one domed bin - 1,280 t of fabricated structural steel
МестоположениеInland industrial zone, Kenya - dry bright highland climate, reddish earth, seasonal dust
СоавторыMilling-line supplier · local civil works - frame set around the grain intake and silo sequence
Доставка39 weeks on site - milling tower commissioned before the warehouse handover
Сфера нашей деятельностиStructural design and 3D modelling · multi-bay portal frames · attached milling tower frame · secondary steel and bracing · roof sheeting with ventilated ridge caps · wall cladding and trims · silo support steel and transfer gantries · gutters and downpipes · erection drawings and site support

Обзор проекта

A flour mill only runs as well as the route grain takes through it.

SynJect supplied 1,280 tonnes of structural steel for a 15,000 m² flour factory and warehouse in Kenya, built around one continuous low-pitched roof that covers milling, packing and bagged storage. Grain intake, the milling tower and dispatch sit under the same weather line, so product never crosses an open yard.

Этот frame follows the grain flow. Four galvanized silos and a domed bin stand beside the tall milling tower, with transfer gantries running between them, while the wide warehouse bays carry the packing and pallet lines at floor level.

The highland Kenyan site drives the detailing: ventilated ridge caps that purge heat and fine flour dust, sealed light-coloured cladding against seasonal dust, and galvanized steel on every exposed gantry, stair and silo support.

Завершенный проект мукомольного завода и склада площадью 15 000 м² в Кении, вид с воздуха: серебристо-серые крыши с небольшим уклоном, четыре оцинкованных силоса и темно-синяя мукомольная башня

Четыре ключевых решения

01

One Weather Line

Milling, packing and storage share a single roof, so grain never crosses an open yard.

02

Silos Beside The Mill

Four silos and a domed bin feed the tower through short transfer gantries.

03

Ventilated Ridge

Ridge caps purge heat and fine flour dust without adding roof penetrations.

04

Dust-Sealed Envelope

Sealed light-coloured cladding and covered transfers suit a dry, dusty highland site.

Отзыв клиента

Feedback from Mill Project Manager after handover.

SynJect erection crew in hard hats holding a red company banner on the paved forecourt of the flour factory in Kenya
Бригада по изготовлению и монтажу на объекте
“

The silos, the tower and the packing hall were always going to be one building. Having a single frame package meant the transfer gantries lined up first time.

Mill Project ManagerFlour milling company, Kenya
15,000 m² under one roofFour galvanized silos1,280 t of fabricated steel

Часто задаваемые вопросы

Часто задаваемые вопросы от покупателей, выбирающих данный тип здания.

How is a 15,000 m² flour factory in Kenya quoted?

A 15,000 m² flour factory in Kenya is quoted against an itemised bill of quantities rather than a flat rate per square metre, because bay spacing, eave height, the attached milling tower, silo support loads, wind and dust assumptions, coating specification and delivery distance all change the steel tonnage that SynJect has to fabricate. The BOQ separates primary frames, secondary steel, roof and wall sheeting, gantries, trims, fasteners and coatings so each line can be compared between bidders. Send SynJect the process layout, eave height, silo schedule and site location and the quantities come back itemised against those inputs.

The steel package for the 15,000 m² flour factory in Kenya covers structural design and 3D modelling, the multi-bay portal frames, the attached milling tower frame, secondary steel and bracing, roof sheeting with ventilated ridge caps, wall cladding with navy trims and the silo transfer gantries as one coordinated supply. Earthworks, foundations, the floor slab, silos themselves, milling equipment, dust extraction and utilities sat outside that package on this project. The table below shows the boundary as it was applied on the delivered mill. In the steel package Outside the package Portal frames, tower frame, bracing, secondary steel Earthworks, foundations and ground-floor slab Roof sheeting, wall cladding, ridge caps, trims Grain silos, milling lines and dust extraction Silo support steel and transfer gantries Electrical, plumbing and fire services 3D model, shop drawings and erection drawings Local erection labour, cranes and permits

A steel flour mill in Kenya is designed to the local authority load requirements together with internationally recognised steel design standards for the frames, connections and coatings. For the delivered 15,000 m² plant, the design basis recorded the highland wind exposure, seasonal dust load, silo support reactions and the thermal movement assumed across the long roof runs. Every SynJect project is modelled in 3D before fabrication, so connection schedules and code checks stay traceable from model to shop drawing. Ask for the design basis report with the BOQ and the assumptions are visible before cutting starts.

Fabrication, shipping and erection for a Kenya mill project run as one coordinated sequence: SynJect fabricates and trial-assembles the frames at the works, ships members in erection order, and hands the site team a crane study plus marked erection drawings before the first lift. On this plant, the milling tower frame went up first so the transfer gantries could be aligned to the silo positions early. The sequencing plan, crane study and erection drawings are part of the SynJect package, so local contractors price lifts against drawings.

Combustible flour dust in the delivered Kenya mill is handled by the building envelope and the roof detailing: ventilated ridge caps purge fine dust and heat at the highest point, sealed wall and roof junctions prevent dust lodging in cavities, and covered transfer gantries keep product out of the open air between the silos and the tower. Dust extraction equipment and explosion relief panels belong to the process package, but their positions were reserved in the 3D model before fabrication. Ask for the interface drawing set with the BOQ and the steel-to-process boundary becomes unambiguous.

Four galvanized silos and one domed bin beside the milling tower suit a 15,000 m² flour plant because grain can be segregated by batch without long horizontal conveying runs. Short transfer gantries between the silos and the tower cut both conveying energy and the number of places where dust can escape into the production hall. Silo support reactions were fed into the frame model as point loads, so the adjacent portal bays and their bracing were sized for those loads from the start. A later silo addition is possible, but only if its load case is included in the first design basis rather than added afterwards.

The ground-floor slab under milling and packing lines sits outside the SynJect steel package and is poured by the local civil contractor against our hold-down details. On the Kenya plant, milling equipment loads, joint layout, flatness class and silo foundation interfaces were agreed between the two packages before the slab was specified. The milling equipment sets those tolerances, not the frame, so the line supplier has to sign them off early. Request the interface drawing set with the BOQ and the steel-to-slab boundary becomes unambiguous.

The 15,000 m² figure covers everything under roof on the delivered project in Kenya: the milling hall, the packing and palletising bays, the bagged-storage warehouse and the covered transfer routes between them. External silos, the domed bin, yard roads, truck aprons and drainage are excluded from that number. Quoting area this way makes bids directly comparable, because one supplier cannot hide the tower footprint outside the total. Ask any bidder to split hall, warehouse and tower areas in the same manner before comparing tonnages.

The low-pitched roof on this Kenya flour factory keeps the enclosed volume tight while the ventilated ridge caps release heat and fine flour dust at the highest point of each bay. Short, even roof falls also keep gutter runs clear of the transfer gantries and away from the silo loading points. A steep roof would add unheated volume above the milling lines without adding usable floor space. Ridge cap positions were fixed in the 3D model before fabrication, so they never clash with purlins or bracing.

The Kenya warehouse bays can be extended by repeating another portal bay beyond the packing hall, because the end frame was detailed as a removable future-extension frame rather than a permanent braced wall. Roof sheeting, cladding profile and purlin centres all run to the same grid, so a new bay continues the envelope without a step in the roof line. SynJect recorded the extension assumptions in the design basis, including the extra bay load and the future downpipe position. Confirm the extension bay in the first BOQ and the end-frame connections are fabricated ready for it.

Получите круглосуточный перечень работ и смету

Узнайте, на каком объеме стального проката и морских перевозок вы сможете сэкономить до начала изготовления

8–15%

Сокращение веса стальных конструкций

3D-моделирование в Tekla в масштабе 1:1 позволяет оптимизировать соотношение балок и колонн, что позволяет избежать излишних затрат на материалы.

0,0 мм

Верификация кода с нулевым количеством конфликтов

Проверено на соответствие стандарту EN 1090 и местным ветровым и сейсмическим нагрузкам.

100%

Обзор «от инженера к инженеру»

Проверено нашими ведущими инженерами — никаких назойливых коммерческих звонков, только полезные данные и цены от производителя.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Служба технической поддержки и консультаций

Ведущие инженеры онлайн

Чертежи
Чертежи

🔒 100% конфиденциальность и безопасность, без спама