Bâtiment d'une cimenterie de 1 596 m², au Pakistan
A 604 t steel frame with curved rafter spans carries clinker handling and covered storage under one dust-sealed roof in Pakistan.
Données du projet
Facts a contractor checks first: Cement production and clinker handling - Long-span curved-rafter portal frames with open-sided storage bays, 1,596 m² under roof.
| Industrie | Cement production and clinker handling - raw material storage, grinding and covered dispatch |
|---|---|
| Type de construction | Long-span curved-rafter portal frames with open-sided storage bays - misty blue-grey cladding, silver-grey roof, navy trims |
| Ampleur du projet | 1,596 m² under roof - 604 t of fabricated structural steel |
| Lieu | Inland industrial site, Pakistan - hot arid climate, windblown dust, monsoon rain and high summer temperatures |
| Collaborateurs | Local civil works · process equipment supplier - frame set around the curved rafter grid and the loading bay |
| Livraison | 12 weeks on site - roof closed before the process equipment fit-out |
| Notre champ d'action | Structural design and 3D modelling · long-span curved-rafter frames · secondary steel and roof bracing · silver-grey roof sheeting with gutters · misty blue-grey wall cladding with navy trims · long high-level window bands · open-sided storage bays · loading openings · downpipes · erection drawings and site support |
Présentation du projet
A cement plant needs wide clear spans and an envelope that keeps fine dust where it belongs.
SynJect supplied 604 tonnes of structural steel for a 1,596 m² cement plant building in Pakistan, built around repeated long-span curved-rafter frames over covered storage and handling bays. The curved rafter profile gives the clear width that clinker handling needs without a mid-span column.
Le frame follows one repeated grid. Purlin centres, cladding profile and navy trims stay identical from the first bay to the last, while long high-level window bands bring daylight into the storage hall without adding low-level openings where dust would be driven in. Open-sided bays keep the loading route clear.
The arid site drives the detailing: sealed misty blue-grey cladding with gasketed trims keeps cement dust and windblown sand out, light silver-grey roof sheeting limits solar gain, and generous eave gutters shed monsoon downpours clear of every loading opening.

Quatre décisions décisives
Curved Rafter Spans
Clear width without a mid-span column.
Repeated Bay Grid
Identical frames keep fabrication standard.
Dust-Sealed Envelope
Gasketed trims keep fine cement dust out.
Monsoon-Ready Roof
Sized gutters shed seasonal downpours.
Le projet réalisé
The same building seen from the front elevation, inside the storage bays and during frame erection.






Témoignage du client
Commentaires du chef de projet de l'usine après la remise des clés.

The curved rafters gave us the clear width for the handling line. One repeated grid kept the whole erection sequence simple.
Questions fréquentes
Questions fréquemment posées par les acheteurs qui recherchent ce type de bien immobilier.
How is a 1,596 m² cement plant building in Pakistan quoted?
A 1,596 m² cement plant building in Pakistan is quoted against an itemised bill of quantities rather than a flat rate per square metre, because rafter span, bay count, eave height, dust and equipment loads, monsoon rain and wind loads, cladding specification and delivery distance all change the steel tonnage that SynJect has to fabricate and ship. The BOQ separates primary frames, secondary steel, roof and wall sheeting, window bands, loading openings, trims, fasteners and coatings so each line can be compared between bidders. Send SynJect the span, bay schedule and site location and the quantities come back itemised against those inputs.
What is included in the steel package for a cement plant — and what is not?
The steel package for the 1,596 m² building in Pakistan covers structural design and 3D modelling, the curved-rafter frames, secondary steel and roof bracing, silver-grey roof sheeting with gutters, misty blue-grey cladding with navy trims, long high-level window bands, the open-sided storage bays and loading openings as one coordinated supply. Earthworks, foundations, the floor slab, kilns, mills, conveyors, dust extraction plant, utilities and fire systems sat outside that package on this project. The table below shows the boundary as it was applied on the delivered building. In the steel package Outside the package Curved-rafter frames, bracing and secondary steel Earthworks, foundations and floor slab Roof sheeting, wall cladding, gutters and trims Kilns, mills, conveyors and dust extraction Window bands, open bays and loading openings Process utilities and fire systems 3D model, shop drawings and erection drawings Local erection labour, cranes and permits
Which design codes and documentation apply to a steel cement plant in Pakistan?
A steel cement plant in Pakistan is designed to the local authority load requirements together with recognised steel design standards for the frames, connections and coatings. For the delivered 1,596 m² building, the design basis recorded long-span rafter loads, monsoon wind and rainfall exposure, equipment suspension loads and the coating assumptions used for the abrasive dusty site. Every SynJect project is modelled in 3D before fabrication, so connection schedules and code checks stay traceable from model to shop drawing. Ask for the design basis report with the BOQ and the assumptions are visible before cutting starts.
How are fabrication, shipping and erection sequenced for a cement plant?
Fabrication, shipping and erection for a Pakistan cement plant run as one coordinated sequence: SynJect fabricates and trial-assembles the curved rafter frames at the works, ships members in erection order, and hands the site team a crane study plus marked erection drawings before the first lift. On this building, the roof was closed before the process equipment fit-out, so mills and conveyors arrived onto a dry slab. The sequencing plan, crane study and erection drawings are part of the SynJect package, so local contractors price lifts against drawings.
Why use curved rafter spans instead of a standard portal frame?
Curved rafter spans suit cement handling because clinker storage and conveyors need a wide clear width without a mid-span column, and the arched profile sheds dust rather than collecting it on flat ledges. One repeated rafter grid also keeps connection details and roof sheet lengths identical across every bay. Equipment suspension loads were built into the frame design from the start, so conveyor hangers did not need a later structural review. A standard frame with intermediate columns would fix the handling layout early and reduce the usable clear width.
How are cement dust, monsoon rain and desert heat handled?
Cement dust, monsoon rain and desert heat in the delivered Pakistan building are handled at roof and wall level: sealed misty blue-grey cladding with gasketed trims keeps fine dust out, high-level window bands avoid low openings where dust is driven in, light silver-grey roof sheeting limits solar gain, and continuous eave gutters shed monsoon downpours. Dust extraction equipment belongs to the process package, but its duct penetrations were coordinated in the 3D model before fabrication. Gutter and downpipe positions were fixed before fabrication, so they never clash with conveyor hangers.
Who is responsible for the floor slab and process equipment?
The floor slab and process equipment at a cement plant sit outside the SynJect steel package and are delivered by the local civil and equipment contractors against our hold-down and suspension details. On the Pakistan building, slab levels, mill loads, conveyor hanger positions and drainage falls were agreed between the packages before the slab was specified. The equipment supplier sets the machine footprint, not the frame, so the interface has to be signed off early. Request the interface drawing set with the BOQ and the steel-to-slab boundary becomes unambiguous.
What does the 1,596 m² figure cover on this Pakistan plant?
The 1,596 m² figure covers everything under roof on the delivered project in Pakistan: the covered storage bays, the clinker handling zone and the enclosed service strip inside the building line. The open loading apron, site roads, perimeter drainage and any free-standing silos are excluded from that number. Quoting area this way makes bids directly comparable, because one supplier cannot hide the handling zone outside the total. Ask any bidder to split storage bays and handling zone in the same manner before comparing tonnages.
What does the 604 t figure refer to on this building?
The 604 t figure is the delivered structural steel tonnage for the Pakistan plant: the curved rafter frames, secondary steel and bracing, roof structure, window band framing and loading opening frames. Roof sheeting, wall cladding and glazing are scheduled separately in the BOQ as sheet and panel quantities. The high tonnage relative to floor area comes from the long clear spans and the equipment suspension loads. Ask any bidder to split primary frames and secondary steel before comparing offers on tonnage alone.
Can more bays be added later, and how was the frame set out for it?
More bays can be added at the end of this Pakistan plant, because the end frame was detailed as a removable future-extension frame, not a permanent braced wall. Roof sheeting, cladding, window band height and purlin centres all run to the same grid, so another bay continues the envelope with no step in the roof line. SynJect recorded the extension assumptions in the design basis, including the extra bay load and the future downpipe position. Confirm the extension bay in the first BOQ and the end-frame connections are fabricated ready for it.
Obtenez votre devis et votre plan de coûts en 24 heures
Découvrez combien vous pouvez économiser en tonnage d'acier et en frais de transport maritime avant le début de la fabrication
Réduction du poids de l'acier
La modélisation 3D 1:1 dans Tekla optimise les rapports poutre-poteau afin d'éliminer les coûts liés aux matériaux superflus.
Vérification de code sans conflit
Vérifié conformément à la norme EN 1090 et aux charges locales dues au vent et aux séismes.
Revue d'ingénieur à ingénieur
Vérifié par nos ingénieurs en chef — Aucun appel commercial insistant, uniquement des données exploitables et des prix d'usine.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Ingénieurs en chef en ligne
🔒 100 % confidentiel et sécurisé, sans spam