Industrial Steel Buildings · Saudi Arabia

Pabrik Sepatu dengan Luas 27.000 m² Tanpa Tiang Penopang

A 100 m clear span keeps the whole footwear flow — cutting, stitching, lasted assembly, packing — on one unbroken floor in Saudi Arabia.

27,000 m²Di bawah atap
100 mJarak bebas
2,050 tStructural steel
28 mingguDi lokasi

Data proyek

Facts a contractor checks first: Footwear manufacturing - Single-storey clear-span portal frame with annex block, 27,000 m² under roof, 100 m clear span.

Fakta dan spesifikasi proyek
IndustriFootwear manufacturing - cutting, stitching, lasting and packing on one floor
Jenis konstruksiSingle-storey clear-span portal frame with annex block - misty blue-grey cladding, navy accent stripes, silver-grey roof
Skala proyek27,000 m² under roof, 100 m clear span - 2,050 t of fabricated structural steel
LokasiDesert-edge industrial zone, Saudi Arabia - sandy gravel ground, high heat and dust load
MitraProduction-line supplier · local civil works - frame set around the footwear line sequence
Pengiriman28 weeks on site - lines commissioned before the annex handover
Ruang lingkup kamiStructural design and 3D modelling · 100 m clear-span portal frames · annex block and external stair tower · entry canopy and pipe rack · roof sheeting with translucent daylight strips · wall cladding and trims · gutters and downpipes · erection drawings and site support

Gambaran umum proyek

A footwear line hates interruptions — so the steel frame gives it none.

SynJect supplied 2,050 tonnes of structural steel for a 27,000 m² shoe factory in Saudi Arabia, built around a 100 m clear-span production hall. Cutting, stitching, lasting and packing sit on one unbroken floor, so trolleys and line overheads run the full length of the building without a single column in the way.

Yang frame follows the line sequence. The tall end of the asymmetric gable houses the annex block and its external stair tower; roof falls run toward the long wall, and the entry canopy with its process pipe rack anchors the receiving side.

The desert-edge site drives the detailing: sealed light-coloured cladding against heat and dust, translucent roof-light strips that keep artificial lighting down by day, and galvanized steel on every exposed frame and railing.

Pabrik sepatu seluas 27.000 m² dengan bentang bebas yang telah selesai dibangun di Arab Saudi, dilihat dari jalan akses, dengan pelapis dinding berwarna biru-abu-abu kabut yang dihiasi garis-garis aksen biru tua serta atap berwarna abu-abu keperakan

Empat keputusan penentu

01

One Unbroken Floor

A 100 m clear span keeps the whole shoe flow column-free, from cutting to packing.

02

Asymmetric Gable

The high end shelters the annex and services; roof falls run with the line, not against it.

03

Daylight By Default

Translucent roof-light strips along the bay cut daytime lighting load across the hall.

04

Sealed Against Dust

Light-coloured sealed cladding, covered entries and galvanized steel suit a desert-edge site.

Testimoni klien

Umpan balik dari Manajer Proyek Pabrik setelah serah terima.

SynJect erection crew in hard hats holding a red company banner on the sandy gravel forecourt of the clear span shoe factory in Saudi Arabia
Tim fabrikasi dan pemasangan di lokasi
“

The 100 m span was decided early, and everything else followed. When the line supplier saw the floor, they redrew the layout twice — and the steel never had to move.

Manajer Proyek Pembangkit ListrikFootwear manufacturer, Saudi Arabia
100 m clear span27,000 m² under one roof2,050 t of fabricated steel

Pertanyaan umum

Pertanyaan umum dari pembeli yang memilih tipe bangunan ini.

How is a 27,000 m² clear-span shoe factory in Saudi Arabia priced?

A 27,000 m² clear-span shoe factory in Saudi Arabia is priced against a bill of quantities, not a fixed per-square-metre rate. The price is driven by the 100 m span, eave height, wind and thermal loads, cladding specification and delivery distance within Saudi Arabia, because each of these changes the steel tonnage and the erection effort. For the delivered project, the BOQ covered the portal frames, annex block, secondary steel, roof sheeting, wall cladding and trims as one package. Foundations, floor slab, internal fit-out and utilities sat outside it, priced by the local civil contractor. Send SynJect the span, eave height, line layout and site location, and the BOQ comes back itemised against those variables.

The steel package for the 27,000 m² shoe factory in Saudi Arabia covers structural design, the 100 m clear-span portal frames, the annex block, secondary steel, roof sheeting with translucent daylight strips, wall cladding with trims, gutters, downpipes and erection drawings. Site works sit outside the package: earthworks, foundations, the ground-floor slab, internal partitions, MEP and the production equipment itself are procured locally under separate contracts. The table below shows the boundary as it was applied on this project. In the steel package Outside the package Portal frames, annex block, secondary steel Foundations and ground slab Roof sheeting with daylight strips Internal partitions and ceilings Wall cladding, trims, gutters, downpipes MEP, HVAC and production machinery Entry canopy, pipe rack, stair tower Site works and external roads 3D model, erection drawings, site support Cladding-day craneage and labour

A long-span factory building in Saudi Arabia is designed to the Saudi building code load requirements together with international steel design standards for the frames and connections. For the delivered shoe factory, the 100 m portal frames were checked for desert wind gusts, high thermal differential and the dust load that accumulates on roofs in the region. Every SynJect project is modelled in 3D before fabrication, so the connection schedule and the code checks stay traceable from model to shop drawings. Ask for the design basis report alongside the BOQ and the assumptions are on the table before fabrication starts.

Fabrication, shipping and erection for a Saudi Arabian factory project run in three stages: frames and secondary steel are fabricated and pre-assembled at the works, shipped in erection sequence to the site, and raised frame by frame with a site team working to the 3D model. For the delivered shoe factory, erection started at the annex end so the entry canopy and pipe rack went up first, keeping the receiving side of the site live while the main span was being framed. The sequencing plan, crane study and erection drawings are part of the SynJect package, so the local contractor prices the lifts against drawings rather than guesses.

A 100 m clear span suits a shoe production hall because footwear lines get rearranged every few seasons, and every column removed is a layout that no longer has to work around it. In the delivered 27,000 m² factory in Saudi Arabia, cutting, stitching, lasting and packing were resequenced twice during fit-out without touching the steel. The trade-off is heavier frames and connections than a columned building of the same footprint, which is exactly what the bill of quantities prices out. If the line layout is fixed for life, a columned frame is cheaper; if it will move, the clear span pays for itself.

Daylight and smoke ventilation in the delivered 27,000 m² hall are handled at roof level: translucent roof-light strips run along the bays between the trusses, keeping the working floor bright through most desert daylight hours without direct glare on the lines. The same roof zoning carries the smoke ventilation strategy, with the ridge zone kept clear so any future ventilators or extract points sit where the smoke will gather first. Both the strip layout and the ridge clear-zone were fixed in the 3D model before fabrication, so they never clash with the purlins or bracing.

The ground-floor slab under a footwear production hall sits outside the SynJect steel package and is poured by the local civil contractor against our hold-down details. In the delivered Saudi Arabian factory, the slab was cast after the frames were raised, so anchorage positions were taken directly from the as-built model. Line loads, joint layout and flatness classes are agreed between the two packages before the slab is specified, because the shoe line machinery sets the tolerances, not the frame. Ask for the interface drawing set with the BOQ and the steel-to-slab boundary is unambiguous.

The 27,000 m² figure covers everything under roof on the delivered project in Saudi Arabia: the 100 m clear-span production hall plus the annex block that houses the entry, offices and welfare rooms at the tall end of the building. It does not include the yard, external roads or the pipe-rack run outside the canopy line, which belong to the site package. Areas quoted this way are directly comparable between bidders — ask any supplier to split hall and annex the same way.

The asymmetric gable on this Saudi Arabian shoe factory puts the extra height where the building needs it: the tall end houses the annex block and its external stair tower, while the roof falls toward the long wall where the production lines run. Falling the roof with the line direction keeps the drainage runs short on the desert-edge site, where a single downpour has to clear the whole 27,000 m² quickly. A symmetric gable would have raised the whole roof to gain one high corner, costing more steel per square metre for no extra usable space.

Sand and dust on this desert-edge site in Saudi Arabia are handled by the building envelope: fully sealed light-coloured cladding with gasketed trims, covered entries at the canopy, and dust-tight lobbies between the outside doors and the production floor of the 27,000 m² hall. The light misty blue-grey and silver-grey finish also reflects a large share of the desert solar gain, keeping the hall’s cooling load down through the hottest months. Galvanized exposed steel on the stair tower, railings and pipe rack stands up to blowing sand without repainting cycles.

Dapatkan BOQ dan Rencana Biaya 24 Jam Anda

Lihat seberapa banyak tonase baja dan biaya pengiriman laut yang dapat Anda hemat sebelum proses fabrikasi dimulai

8–15%

Penghematan Berat Baja

Pemodelan 3D Tekla dengan skala 1:1 mengoptimalkan rasio balok-kolom untuk menghilangkan biaya bahan yang berlebihan.

0,0 mm

Verifikasi Kode Tanpa Konflik

Telah diverifikasi sesuai dengan standar EN 1090 serta beban angin dan gempa setempat.

100%

Tinjauan Antar-Insinyur

Telah diverifikasi oleh para insinyur utama kami—Tanpa panggilan penjualan yang memaksa, hanya data yang dapat ditindaklanjuti dan harga pabrik.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Meja Layanan Teknik & Pertanyaan

Insinyur Utama Online

Gambar
Gambar

🔒 100% Pribadi dan Aman, Tanpa Spam