المباني الصناعية الفولاذية · إندونيسيا

مصنع لتصنيع المعدات الإلكترونية بمساحة 24,000 متر مربع، إندونيسيا

A 2,100 t steel frame under one continuous roof carries four production levels of electronics assembly in Indonesia. Floor area is an engineering estimate derived from the structural steel tonnage and the building grid.

2,100 tStructural steel
4 floorsProduction levels
42 weeksفي الموقع
6 baysRepeated frame grid

بيانات المشروع

Facts a contractor checks first: Electronics equipment manufacturing - Multi-level steel frame with one continuous low-pitched roof, 2,100 t of fabricated structural steel.

حقائق ومواصفات المشروع
الصناعةElectronics equipment manufacturing - assembly, testing and packing of consumer electronics
نوع البناءMulti-level steel frame with one continuous low-pitched roof - misty blue-grey cladding, silver-grey roof, navy window trims
حجم المشروع2,100 t of fabricated structural steel - four production levels under one roof plane
الموقعIndustrial park site, Indonesia - hot humid tropical climate, heavy seasonal rain, high solar gain
المتعاونونLocal civil works · building services supplier - frame set around the production grid and the service cores
التسليم42 weeks on site - roof closed before the upper-level fit-out
نطاق عملناStructural design and 3D modelling · multi-level primary steel frame · secondary steel and floor bracing · silver-grey roof sheeting with gutters · misty blue-grey wall cladding with navy window trims · long ribbon window bands · loading openings · service-core framing · downpipes · erection drawings and site support

نظرة عامة على المشروع

Electronics assembly needs a long unbroken floor plate and a roof that closes early.

SynJect supplied 2,100 tonnes of structural steel for an electronics equipment manufacturing plant in Indonesia, built as a four-level steel frame under one continuous silver-grey roof. Long ribbon window bands run the full length of each production floor, so assembly lines get even daylight without a break in the frame grid.

الـ frame follows one repeated grid. Column centres, floor beam depths and cladding panels stay identical from the first bay to the last, while service cores and loading openings sit on the same module. Misty blue-grey cladding with navy trims gives the long elevations a single consistent reading.

The humid tropical site drives the detailing: shallow roof falls and continuous eave gutters shed intense seasonal rain clear of the loading bays, light silver-grey roof sheeting limits solar gain, and sealed cladding with gasketed trims keeps humid air out of the production floors.

تم الانتهاء من إنشاء مصنع لتصنيع المعدات الإلكترونية في إندونيسيا، يتميز بسقف متواصل باللون الرمادي الفضي وتكسية باللون الرمادي المزرق الضبابي

أربعة قرارات حاسمة

01

Repeated Frame Grid

Identical bays keep beams and panels standard.

02

Continuous Roof

One roof plane closes the envelope early.

03

Long Window Bands

Even daylight along every production floor.

04

Rain-Ready Envelope

Sized gutters and sealed joints handle tropical rain.

شهادة العميل

Feedback from Plant Engineering Manager after handover.

SynJect erection crew in hard hats holding a red company banner on the paved forecourt of the completed electronics plant in Indonesia
فريق التصنيع والتركيب في الموقع
“

One grid from end to end. The line layout changed twice during fit-out and the frame never needed a revision.

Plant Engineering ManagerElectronics manufacturer, Indonesia
2,100 t structural steelFour production levelsOne continuous roof plane

الأسئلة الشائعة

الأسئلة الشائعة من المشترين الذين يختارون هذا النوع من المباني.

How is an electronics manufacturing plant in Indonesia quoted?

An electronics manufacturing plant in Indonesia is quoted against an itemised bill of quantities rather than a flat rate per square metre, because floor count, column grid, floor loading, roof span, window band extent, tropical wind and rainfall loads, coating specification and delivery distance all change the steel tonnage that SynJect has to fabricate and ship. The BOQ separates primary frames, floor beams and bracing, secondary steel, roof and wall sheeting, window bands, service-core framing, trims, fasteners and coatings so each line can be compared between bidders. Send SynJect the column grid, floor count and site location and the quantities come back itemised against those inputs.

The steel package for the Indonesia plant covers structural design and 3D modelling, the four-level primary frame, floor beams and bracing, secondary steel, silver-grey roof sheeting with continuous gutters, misty blue-grey wall cladding with navy trims, the long ribbon window bands, loading openings and the service-core framing as one coordinated supply. Earthworks, foundations, floor slabs, glazing, cleanroom fit-out, process utilities, HVAC, lifts and fire services sat outside that package on this project. The table below shows the boundary as it was applied on the delivered plant. In the steel package Outside the package Multi-level frames, floor beams and bracing Earthworks, foundations and floor slabs Roof sheeting, wall cladding, gutters and trims Glazing, cleanrooms and process utilities Window bands, loading openings, service cores HVAC, lifts and fire services 3D model, shop drawings and erection drawings Local erection labour, cranes and permits

A steel electronics plant in Indonesia is designed to the local authority load requirements together with internationally recognised steel design standards for the frames, connections and coatings. For the delivered 2,100 t plant, the design basis recorded production floor loading, tropical wind and rainfall exposure, long window band lintel loads and the humidity assumptions used for the coating specification. Every SynJect project is modelled in 3D before fabrication, so connection schedules and code checks stay traceable from model to shop drawing. Ask for the design basis report with the BOQ and the assumptions are visible before cutting starts.

Fabrication, shipping and erection for an Indonesia plant run as one coordinated sequence: SynJect fabricates and trial-assembles the repeated frames at the works, ships members in erection order, and hands the site team a crane study plus marked erection drawings before the first lift. On this plant, the whole roof was closed before upper-level fit-out began, so sensitive assembly equipment stayed dry through the rainy season. The sequencing plan, crane study and erection drawings are part of the SynJect package, so local contractors price lifts against drawings.

A repeated steel grid suits electronics production because assembly lines are re-laid frequently and need long unbroken floor plates with predictable column positions. One grid also keeps beam depths, connection details and cladding panels identical across all four levels, which shortens fabrication and makes later line changes simple. Floor loading was built into the frame design from the start, so equipment can be moved without a structural review each time. A concrete frame would fix the column layout earlier and slow down every later change to the line.

Tropical rain, humidity and heat in the delivered Indonesia plant are handled at roof and wall level: shallow roof falls drive heavy rain into continuous eave gutters, downpipes drop clear of every loading opening, light silver-grey roof sheeting limits solar gain, and sealed misty blue-grey cladding with gasketed trims keeps humid air out of the production floors. Internal humidity control belongs to the HVAC package, but the sealed envelope keeps that system sized to a predictable load. Gutter and downpipe positions were fixed in the 3D model before fabrication, so they never clash with window bands or service cores.

Floor slabs and cleanroom fit-out at an electronics plant sit outside the SynJect steel package and are delivered by the local civil and fit-out contractors against our beam and hold-down details. On the Indonesia plant, slab levels, equipment loads, service penetrations and cleanroom partition lines were agreed between the packages before the slabs were specified. The process equipment supplier sets the machine footprint, not the frame, so the interface has to be signed off early. Request the interface drawing set with the BOQ and the steel-to-slab boundary becomes unambiguous.

The 2,100 t figure covers all fabricated structural steel on the delivered project in Indonesia: the four-level primary frames, floor beams and bracing, secondary steel, roof structure, service-core framing and the framing around window bands and loading openings. Roof sheeting, wall cladding and glazing are scheduled separately in the BOQ. Quoting steel this way makes bids directly comparable, because one supplier cannot hide floor steel outside the tonnage. Ask any bidder to split primary frames and secondary steel in the same manner before comparing offers.

The Indonesia plant uses one continuous silver-grey roof plane because a single uninterrupted envelope could be closed early, letting upper-level fit-out proceed through the rainy season. Structurally it keeps one purlin grid and one gutter run across the whole building instead of stepping the roof at each level change. Long ribbon window bands sit below that single roof edge, so daylight is even on every production floor. A stepped roof would have added parapets, extra gutters and more water-entry points into a humidity-sensitive building.

More bays can be added at the gable end of this Indonesia plant, because the end frame was detailed as a removable future-extension frame, not a permanent braced wall. Floor beams, cladding, window band height and purlin centres all run to the same grid, so another bay continues the envelope with no step in the roof line. SynJect recorded the extension assumptions in the design basis, including the extra bay load and the future downpipe position. Confirm the extension bay in the first BOQ and the end-frame connections are fabricated ready for it.

احصل على قائمة الأعمال المطلوبة وخطة التكاليف على مدار 24 ساعة

اكتشف مقدار ما يمكنك توفيره من حمولة الصلب والشحن البحري قبل بدء عملية التصنيع

8–15%

تخفيض وزن الفولاذ

1:1 تعمل النمذجة ثلاثية الأبعاد باستخدام برنامج Tekla على تحسين نسب العوارض والأعمدة للتخلص من التكاليف الزائدة للمواد.

0.0 ملم

التحقق من الكود الخالي من التضارب

تم التحقق من مطابقتها لمعيار EN 1090 والأحمال المحلية الناتجة عن الرياح والزلازل.

100%

مراجعة من مهندس إلى مهندس

تم التحقق من صحة هذه المعلومات من قِبل كبار مهندسينا — لا مكالمات مبيعاتية مزعجة على الإطلاق، بل بيانات قابلة للتطبيق وأسعار المصنع فقط.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

مكتب الهندسة والاستفسارات

المهندسون الرئيسيون عبر الإنترنت

الرسومات
الرسومات

🔒 خصوصية وأمان بنسبة 100٪، بدون رسائل غير مرغوب فيها